![Mercia Garden Products 03OVLPBRN0705-V2 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/mercia-garden-products/03ovlpbrn0705-v2/03ovlpbrn0705-v2_instructions-manual_1772627003.webp)
Step 5
Fix the Door Gable and remaining
Plain Panel using the same
method shown in step 4.
9x 50mm Screws
1
3
50mm
screw
Step 6
Fix the
Ridge Bar between
the apex of the two
gables, using a Corner
Brace at each end secured
using 30mm screws.
8x 30mm Screws
9
18
30mm
screw
Step 7
Fix a Roof Eave to one
edge of Roof Sheet and Fix
using 4x 30mm screws per
Eave.
8x 30mm Screws
7
8
30mm
screw
Step 8
16x 30mm Screws
Fix the
Roof Sheets on
either side as shown in
diagram.
Fix panels into position
using 30mm screws
from the top of the
panel, straight into the
framing and ridge bar.
Pre drill holes before
hand.
Ensure the larger over
hang on both panels
are at the front of the
building
30mm
screw