Mercia Garden Products 03DTSHPN1208FGC32TWSA-V1 Скачать руководство пользователя страница 3

41

42

43

44

P 3

Please retain product label and instructions for future reference

             

Step 1

Parts needed - No. 11 QTY 2

Place floors 

(No. 11)

 on a firm and 

level base, ensure base has suitable 

drainage free from areas where standing 

water can collect. (See front page on base 

requirements). Fix the two floor panels 

together as shown using 50mm screws at 

an angle and alternate the positions.

10x50mm Screws

  

50mm 

screw

Pre drill 

hole

11

11

IMPORTANT: 

Pre-drill before fixing screws.

11

23

23

23

*This building can be built with the shed on the LEFT hand side. Follow the 

same steps but be aware to position panels to the opposite side.*

Secure the floor 

(No. 11)

 to the 

Floor Blocks (

No. 23

) using 2x30mm 

screws per Floor Block. 

6x30mm Screws

Pre drill 

hole

30mm 

screw

Step 2

Parts Needed -

 

No. 23 QTY 3        

IMPORTANT: 

Pre-drill before fixing screws.

11

11

Pre drill 

hole

30mm 

screw

Step 3

Parts Needed -

 

No. 19 QTY 1

 

 

                               

Secure the Storage Floor 

(No. 19)

 to the 

assembly from Step 2, using 2x30mm 

screws per Floor Block. 

6x30mm Screws

IMPORTANT: 

Pre-drill before fixing screws.

19

Butt Hinge QTY 12

Key Plate QTY 1

Turn Button QTY 4 

Fixing kit cont..

Pre Assembly

Before assembling remove the transportation

blocks from the bottom of each panel.

PI-07-0066

PI-07-0017

PI-07-0034

Mortice Lock QTY 1

PI-07-0017

50mm Screw x 136

Felt Tacks x 150

30mm Screw x 139

10mm Screw x 16

70mm Screw x 9

*This building can be built with the shed on the

 LEFT hand side. Follow the same steps but be 

aware to position panels to the opposite side.*

Nail Bag

There may be extra screws present in the nail bag 

40mm Screw x 8 

25mm Screw x 18

Содержание 03DTSHPN1208FGC32TWSA-V1

Страница 1: ...structed Ensure that there will be access to all sides for maintenance work and annual treatment Ensure the base is level and is built on firm ground to prevent distortion Refer to diagrams for the ba...

Страница 2: ...QTY 1 Cover Trim 12x56x2080mm QTY 2 Side Fascia 12x111x1228mm QTY 4 Front Fascia 12x111x1809mm QTY 2 F2744 400mm S12111 1809mm Door Stop QTY 1 33 37 Felt QTY 1 34 38 35 39 36 Press Lock QTY 1 Handle...

Страница 3: ...s per Floor Block 6x30mm Screws Pre drill hole 30mm screw Step 2 Parts Needed No 23 QTY 3 IMPORTANT Pre drill before fixing screws 11 11 Pre drill hole 30mm screw Step 3 Parts Needed No 19 QTY 1 Secur...

Страница 4: ...m Screws Pre drill hole 50mm screw IMPORTANT Pre drill before fixing screws Step 7 Parts Needed No 3 QTY 2 Fix the side of the Back Panel No 3 against the side of the other Back Panel with 4x50mm scre...

Страница 5: ...e diagram externally Make sure that the Framing is flush with other Framing not the cladding Then fix the Internal Panel Framing No 33 to the otherside of the Internal Panel No 5 with 3x50mm screws as...

Страница 6: ...agram Do not secure the building to the Floor until the roof is fitted 3x50mm Screws Pre drill hole 50mm screw 7 IMPORTANT Pre drill before fixing screws 3 Step 13 Parts Needed No 20 QTY 1 Place the D...

Страница 7: ...ith the screws provided Fit the key plate No 43 to the opposite door using the 4X30mm screws provided Fix door handles No 37 using 8x30mm screws Fix the Door Trims No 32 to the plain No 17 and seconda...

Страница 8: ...as No 10 flush to the building as shown to make sure the building is square 10 Pre drill hole 70mm screw Step 20 Parts Needed No 10 QTY 2 Lay the 2x Veranda No 10 face down side by side and fix togeth...

Страница 9: ...fitted 16x50mm Screws Pre drill hole 50mm screw Step 25 Screw internally with 50mm screws securing the roof panels No 9 x 3 to all of the panels on the front and back of the building Do not secure the...

Страница 10: ...50mm of overhang around the building Fix into place using 150 x felt tacks at 100mm intervals 150x Felt tacks Felt tacks 1 2 3 35 Step 26 Once the Roof is aligned and secure the Floor can be fixed in...

Страница 11: ...screw IMPORTANT Pre drill before fixing screws Step 29 Parts Needed No 24 QTY 2 No 25 QTY 2 No 26 QTY 1 No 27 QTY 1 No 28 QTY 1 No 29 QTY 2 Fix the Cover Trims 2x No 24 2x No 25 No 26 No 27 No 28 and...

Страница 12: ...ch two Turn Buttons No 44 to the Storage Door Panel at the top and bottom of the door Using 1x 30mm screw per Turn Button ensuring that the screws go through into the Storage Door Panel framing Attach...

Страница 13: ...2 1 3 4...

Страница 14: ...1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE...

Отзывы: