background image

P 5

Please retain product label and instructions for future reference

             

Step 7

Parts needed - No. 1 QTY 1

Fix the Door Panel 

(No. 1)

 between the 

Twin Window Panel 

(No. 2)

 and the Left 

Panel 

(No. 4)

 using 50mm screws in 

alternating directions.

*Please note that the Door panel is 

shorter than the side panels.*

 

Fix the panels together with

 

50mm screws as shown in the

 

illustration.  

 Do 

not

 secure the building 

 

to the floor until the roof

 

is fitted.

8x50mm Screws

Pre drill 

hole

50mm 

screw

1

4

2

Step 8

Parts needed - No. 7  QTY 3

 

 

- No. 20 QTY 3

50mm 

screw

Pre drill 

hole

Fix the Eaves framing 

(No.20)

 to the 

roof 

(No.7)

 using 4x50mm screws per 

eaves framing, screwing through the 

eaves framing and into the roof 

framing.

Ensure the eaves framing is flush 

to the edges of the roof framing 

before securing

12x50mm Screws

7

20

7

20

7

20

Step 9

Parts needed - No. 7 QTY 3

Place the Roof Panels (

No. 7

) onto the top 

of the building.  Align the three Roof Panels 

so they sit square before fixing into postion.

The roof eaves frames (

No. 20

) should sit at 

the back of the building.

*The roof panels should sit on top of the 

left and right panels, the roof panels 

framing should sit on top of the back, 

door and twin window panels.*

Do not secure the building to the Floor 

until the roof is fitted. 

7

7

7

20

Step 10

Fix the three Roof Panels 

(No. 7)

 

together using 50mm screws.  Offset  

the screws from each other as shown 

in the diagram. 

*Roof boards not shown for 

illustration purposes.

Do not secure the building to 

the Floor until the roof is 

fitted.

16x50mm Screws 

Pre drill 

hole

50mm 

screw

7

7

7

Содержание 03DTSHPN1006FGD2TW-V1

Страница 1: ...d avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather condit...

Страница 2: ...utt Hinge QTY 6 PI 07 0066 Door Handle QTY 2 PI 07 0081 Turn Button QTY 2 PI 07 0034 18 19 20 23 22 Press Lock PI 07 0162 Barrel Bolt QTY 2 PI 07 0114 Window Beading Block QTY 16 PI 07 0011 Fitted Win...

Страница 3: ...utt hinges No 22 per door Ensure to predrill holes Fix to the door using 3x25mm screws 3x30mm screws to the Door Panel per hinge ensure the doors open freely Fix the door handles No 27 to the outside...

Страница 4: ...1 Join the Left Panel No 4 together with Back Panel No 5 as shown in the illustration Please note that the back panel is is shorter than the side panels 5 4 Step 5 Parts needed No 3 QTY 1 No 5 QTY 1 C...

Страница 5: ...nto the roof framing Ensure the eaves framing is flush to the edges of the roof framing before securing 12x50mm Screws 7 20 7 20 7 20 Step 9 Parts needed No 7 QTY 3 Place the Roof Panels No 7 onto the...

Страница 6: ...to position making sure they are flush to the front of the building Using a pencil mark on the under roof panel where the roof panel framing is to use as a guide for fixing into place Fix in place mak...

Страница 7: ...is approximately 50mm of overhang around the building Fix into place using 125x felt tacks at 100mm intervals 125x Felt tacks Felt Length 3110mm Felt tacks 1 2 3 24 Step 15 Parts needed No 16 QTY 2 No...

Страница 8: ...ks No 23 to the window before fitting the window into the panel 48x30mm screws 11 c d 11 11 d c 23 Step 17 Parts needed No 12 QTY 1 No 13 QTY 1 Fix a rain guard above the double doors No 12 and one ra...

Страница 9: ...g 2x30mm screws 4x30mm Screws These turn buttons help to keep your doors straight during high low levels of moisture content in the air Pre drill hole 25 25 28 25 30mm screw Step 20 Parts needed No 18...

Страница 10: ...AFTER TREATMENT score around protective cover on glazing and carefully peel covering back SILIC O N E SEA LA N T Step 21 It is recommended that after the construction treatment and the removal of the...

Страница 11: ...2 1 3 4...

Страница 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: