Mercia Garden Products 03DTSHPN0806FGD1TW-V1 Скачать руководство пользователя страница 11

P 7

             

 

 

   

 

 

  





 

 

  

 



  



­ 





  

 

 



€

‚­ƒƒ

 ­€­

‚­ƒ„…†‡‡‡­ˆ‰Š‹‡

 

  

Œ

‚­Ž

  

  

‘ƒŒ

  

 ˆ’ 

  

‚ƒƒƒ

2

Š“

  

 

ƒƒƒ

1

„ƒƒƒ

†

 

”  

 

ƒ” 

„­”  

 



” 

3

4

…

‚­ƒ„…†‡‡‡­ˆ‰Š‹‡

 

•



… 

–

“—Š‰Š˜ˆ—ˆ—’

‚­ƒ„…†‡‡‡­ˆ‰Š‹‡

‚­ƒ„…†‡‡‡­ˆ‰Š‹‡

Содержание 03DTSHPN0806FGD1TW-V1

Страница 1: ...d avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather condit...

Страница 2: ...12 13 17 22 Butt Hinge QTY 6 PI 07 0066 Door Handle QTY 2 PI 07 0081 Turn Button QTY 2 PI 07 0034 18 19 20 21 24 23 Press Lock PI 07 0162 Barrel Bolt QTY 2 PI 07 0114 Window Beading Block QTY 8 PI 07...

Страница 3: ...tt hinges No 23 per door Ensure to predrill holes Fix to the door using 3x25mm screws 3x30mm screws to the Door Panel per hinge ensure the doors open freely Fix the door handles No 21 to the outside o...

Страница 4: ...oin the Left Panel No 4 together with Back Panel No 5 as shown in the illustration Please note that the back panels are shorter than the side panels 5 4 Step 5 Parts needed No 3 QTY 1 No 5 QTY 1 Conne...

Страница 5: ...ng and into the roof framing Ensure the eaves framing is flush to the edges of the roof framing before securing 8x50mm Screws 7 20 20 7 Step 9 Parts needed No 7 QTY 2 Place the Roof Panels No 7 onto t...

Страница 6: ...o position making sure it is flush to the front of the building Using a pencil mark on the under roof panel where the roof panel framing is to use as a guide for fixing into place Fix in place making...

Страница 7: ...re is approximately 50mm of overhang around the building Fix into place using 110x felt tacks at 100mm intervals 110x Felt tacks Felt Length 2550mm Felt tacks 1 2 3 25 Step 15 Parts needed No 16 QTY 2...

Страница 8: ...beading blocks No 24 to the window before fitting the window into the panel 24x30mm screws 11 c d 11 d c 24 Step 17 Parts needed No 12 QTY 1 No 13 QTY 1 Fix the rain guards No 12 above the window and...

Страница 9: ...ons help to keep your doors straight during high low levels of moisture content in the air Pre drill hole 26 26 26 30mm screw Step 20 Parts needed No 18 QTY 2 No 19 QTY 1 On the inside of the building...

Страница 10: ...AFTER TREATMENT score around protective cover on glazing and carefully peel covering back SILIC O N E SEA LA N T Step 21 It is recommended that after the construction treatment and the removal of the...

Страница 11: ...2 1 3 4...

Страница 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Отзывы: