Mercia Garden Products 02TWR-V2-PEFC Скачать руководство пользователя страница 7

Please retain product label and instructions for future reference

             

3

4

6

Step 13

Part Needed  -           

Place the ladder between the front 

post(No.9) and the playhouse left 

hand side rail. 

Ensure the ladder fits flat to the 

floor and fix in place using 

4x50mm screws as shown.

50mm 

screw

4 x 50mm screws

9

Step 11

Parts needed -            &            &

To construct the ladder ensure you 

pre-drill all holes and using 16x50mm 

screws attach each step(No.6) to the ladder 

sides (No.3 & 4).

16 x 50mm screws

50mm 

screw

3

6

4

5

9

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

50kg

 

If slide is purchased, position the 

slide on the opposite side to the 

door as shown in the diagams.

Please retain product label and instructions for future reference

             

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P7 

If slide is purchased, position the 

slide on the opposite side to the 

door as shown in the diagams.

1!

2!

Pre drill 

hole

50kg

 

Step 12

Parts needed -  

To position the Ladder Block (No. 14), 

measure 27mm from upright. This is where 

the block will be fixed wth 2x60mm 

screws. 

2x60mm screws

60mm 

screw

14

14

Содержание 02TWR-V2-PEFC

Страница 1: ...ce BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller...

Страница 2: ...Slide Framing F100100 555mm 11 12 13 10 Slide 70mm Screw x3 50mm Screw x 34 40mm Screw x 2 30mm Screw x 8 150mm Screw x 8 100mm Screw x 19 Nail Bag Part not required if purchased slide Short Rail FC27...

Страница 3: ...age the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed Please retain product label and instructions for future reference Please retain product label and instru...

Страница 4: ...from the edge of the corner brace No 7 up to the post from both ends both measurments should be the same Make a note of the exact measurment and you can then use this as a guide for all the corner bra...

Страница 5: ...k out where the corner braces need to sit on the platform No 1 and the front post No 9 Fix the two corner braces in place using 100mm screws 100mm screw 7 7 9 Step 8 Parts needed Use the measurment ta...

Страница 6: ...to the floor joist Follow the steps on the seperate set of instructions to construct the playhouse 20 x 50mm Screws 50mm screw Once you have finished constructing the playhouse you can now continue t...

Страница 7: ...9 1 2 Pre drill hole 1 2 Pre drill hole 50kg If slide is purchased position the slide on the opposite side to the door as shown in the diagams Please retain product label and instructions for future...

Страница 8: ...0mm screws 50mm screw 5 5 www merciagardenproducts co uk P8 Step 14 Parts needed This and all further steps are for when a slide has been purchased Attach the slide framing No 12 to the side of the pl...

Страница 9: ...ion to the boards of the platform onto which the slide is mounted 7 When mounting or assembling the product attention should be given to minimum required distance between the product and eventual obst...

Страница 10: ...has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks and maintenance are carrie...

Отзывы: