background image

P9

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Playhouse Maintenance:

It is recommended that the following checks and maintenance are carried out at the begin-

ning of each season as well as at regular intervals during the usage season.

- Check all nuts /bolts/ screws for tightness and tighten when required.

- Check for movement / opening of wood giving rise to protrusion of nail heads and tips.

- Check hinges.

- Replace defective parts in accordance with the manufacturers instructions. 

- Check any crossbeams, suspensions and anchors.

- If a swing is included; check the swing seat, chains and ropes.

IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD

Содержание 02GARA0806-V1-PEFC

Страница 1: ...hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slight...

Страница 2: ...V1 Fixing Kit 15 16 17 18 19 20 Black Handle 22 25 24 26 27 28 Fascia 12x95x1960mm SR1295 1960mm Fascia Blocks 27x44x423mm F2744 423mm Railing Upright 27x44x1060mm F2744 1060mm Roof Bearer 27x44x1665m...

Страница 3: ...s co uk P3 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver an...

Страница 4: ...o 10 No 12 into the panels that accomodate a window First fix the Window Block to the Window as shown with 1x30mm screw Place the Window into the window hole and fix by screwing though the Window Bloc...

Страница 5: ...er door hinge 49x30mm black screws 27 8 2 11 Step 5 Parts needed Place the Bunk Floor No 6 onto the horizontal framing of the Back Panel No 3 and flush with the horizontal framing of the Tall Window p...

Страница 6: ...0mm screws 4x30mm screws per bracket 36x30mm screws 30mm screw 30 18 18 18 9 6 30 Step 10 Parts needed To make the Safety Rail secure fix the Railing Upright No 17 into place so that it is flush with...

Страница 7: ...p your building Make sure to screw into the framing Make sure the rear of the building is flush with the Roof OSB This will ensure your roof is straight 8x30mm screws 26x40mm screws 30mm screw 40mm sc...

Страница 8: ...m screw 27 26 2 3 1 Felt tacks Step 16 Parts needed Roll the Felt No 29 from front to back leaving a 50mm felt overlap to the front back and sides Secure with felt tacks at 100mm intervals Use a final...

Страница 9: ...that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tighte...

Отзывы: