background image

02DTTWR0605-V1-PEFC

Overall Dimensions:

Width = 1437mm 

Depth = 1870mm 

Height = 621mm

Base Dimensions: 

Width = 1168mm 

Depth = 1870mm 

Please retain product label and instructions for future reference

           

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

* Measurements do not 

include slide & ladder *

9

10

11

12

Framing - 44x58x1870mm QTY 2

F4458-1870mm  

3

4

5

6

7

8

Leg Brace  - 27x58x400mm QTY 8

F2758-G-440mm ANGLED

Leg Post - 44x58x523mm QTY 4

F4458-523mm

Framing - 27x58x1044mm QTY 1

F2758-1044mm

Framing - 44x58x1080mm QTY 3

F4458-1080mm

Ladder Step - 27x95x476mm QTY 2

F2795-476mm

Ladder Side Right - 650mm QTY 1

PRO2795-650mm

Ladder Side Left - 650mm QTY 1

PRO2795-650mm

Shiplap Board - 12x92x1112mm QTY 2

WBRT92-1112mm

Shiplap Board - 12x92x1200mm QTY 1

WBRT92-1200mm

2

1

Outer Floor QTY 1

AI-S11STISF1168X758-V1

Slide QTY 1

PI-10-0005

50kg

 

Max

50kg

 

Max

Building Content:

Floor Framing - 28x28x1057mm QTY 2

FS2828-1057mm

Floor Framing - 28x28x1162mm QTY 2

FS2828-1162mm

13

14

30mm Screw  x 10

50mm Screw  x 28

Nail Bag

100mm Screw x 28

40mm Screw x 24 

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P3

1!

Look for the symbols and follow the safety guidlines below.

Ensure screw heads 

are subflush and 

sand down any 

splinters created.

Ensure the screws are 

fixed squarely and do 

not protrude.

12mm gap  

surrounding the 

door.

2!

3!

4!

Not to be installed 

over concrete, 

asphalt or any hard 

surface.

50kg

 

50kg per user

Please retain product label and instructions for future reference

             

Содержание 02DTTWR0605-V1-PEFC

Страница 1: ...hlorophenol BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY Check the pack and make sure you have all the parts listed in the parts list provided When you are ready to start make sure you have the right tools at hand not supplied including a Phillips screw driver Flathead screwdriver Stanley knife Wood saw Step ladder Hammer Spirit level and a Drill with 2mm bit Ensure there is plenty of s...

Страница 2: ...uired 02DTSHAX0404BDH1W V1 PEFC Playhouse 02DTTWR0605 V1 PEFC Tower 02DTSHAX0404BDH1W V1 PEFC Playhouse 02DTTWRS0605 V1 PEFC Tower With Slide 02PATINCSWA V1 PEFC Swing Set 02DTSHAX0404BDH1W V1 PEFC Playhouse 02DTTWRS0605 V1 PEFC Tower With Slide 4x4 Playhouse With Tower 4x4 Playhouse With Tower Slide 4x4 Playhouse With Tower Slide Swing Please retain product label and instructions for future refer...

Страница 3: ... PRO2795 650mm Ladder Side Left 650mm QTY 1 PRO2795 650mm Shiplap Board 12x92x1112mm QTY 2 WBRT92 1112mm Shiplap Board 12x92x1200mm QTY 1 WBRT92 1200mm 2 1 Outer Floor QTY 1 AI S11STISF1168X758 V1 Slide QTY 1 PI 10 0005 50kg Max 50kg Max Building Content Floor Framing 28x28x1057mm QTY 2 FS2828 1057mm Floor Framing 28x28x1162mm QTY 2 FS2828 1162mm 13 14 30mm Screw x 10 50mm Screw x 28 Nail Bag 100m...

Страница 4: ... damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE Please retain product label and instructions for future reference DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY www merciagardenproducts co uk P4 ...

Страница 5: ... 4 100mm screw 4 694mm 694mm 1 2 Pre drill hole 4 5 Step 3 Parts needed Lift the assembled frame up and position the leg posts No 6 underneath as shown Fix the leg posts to the frame by screwing through the framing into the leg post using 1x100mm screw per leg post 4x100mm screws 100mm screw 6 6 6 6 1 2 Pre drill hole 6 7 Step 4 Parts needed Fix the Leg Braces No 7 to either side of each leg post ...

Страница 6: ...d secure into position using the 10x30mm screws 10x30mm screws 1 2 Pre drill hole 50kg 50mm screw 8 9 8 9 Step 7 Parts needed Place the Floor Framing No 8 No 9 on top of the floor sheet and locate around the edge as shown ensuring each piece is flush to the edge of the floor sheet Fix each piece into place with 3x50mm screws per frame 12x50mm screws Check the ridigity of the parts and tighten and ...

Страница 7: ... 50mm screw 1 2 Pre drill hole 50kg Step 9 Parts needed Slot the Shiplap Boards No 10 11 into the bottom of the cladding around the sides Fix them into position by screwing through the face of the board into the framing below using 4x40mm screws per board 12x40mm screws 11 40mm screw 11 10 10 11 1 2 Pre drill hole 50kg 10 11 P7 Please retain product label and instructions for future reference DO N...

Страница 8: ...m as shown Fix into position with 2x100mm screws Ensure the top of the ladder is flush with the top of the platform Place the Slide No 2 into position as shown Fix into place with 2x40mm screws The position of the ladder and slide can be reversed to create an alternative set up if desired Do not place either the ladder or slide on the same side that the door opens as this creates a potential safet...

Страница 9: ...ason Check all nuts bolts screws for tightness and tighten when required Check for movement opening of wood giving rise to protrusion of nail heads and tips Check hinges Replace defective parts in accordance with the manufacturers instructions Check any crossbeams suspensions and anchors If a swing is included check the swing seat chains and ropes IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY T...

Страница 10: ... 2 1 3 4 ...

Страница 11: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2 ...

Отзывы: