![Mercia Garden Products 02DTSHAX0606SFHD2W-V1-PEFC Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/mercia-garden-products/02dtshax0606sfhd2w-v1-pefc/02dtshax0606sfhd2w-v1-pefc_general-instructions-manual_1772709007.webp)
Step 6
Parts needed - &
Place the Roof Support bar (
No.
9
) in between the Door Gable and Plain
Gable panels.
Ensure the top of the support bar is
flush with the top of the upright Gable
framing, as shown in the illustration.
Secure in place using one L
Bracket (
No.18
) on each end with
4x30mm screws per bracket.
Do not secure the building to the
floor until the roof is fitted.
8x30mm screws.
18
9
9
30mm
screw
18
1!
2!
Pre drill
hole
A
B
A
B
9
Step 7
Parts needed -
Place one Roof Panel
(No.3)
onto the
Playhouse, ensuring the roof rests into
the gaps of the gable framing and is
flush to the back of the building. The
roof should overhang the front of the
building by 475mm.
Make sure the 16mm overhang on the
roof panel is at the apex of the building.
Secure by screwing through the roof
panel
(No.3)
into the gables and panel
below using 9x40mm screws.
Do not secure the building to the
Floor until the Roof is fitted.
9x40mm screws
1!
2!
Pre drill
hole
3
40mm
screw
3
3
Step 8
Parts needed -
Locate and secure the other Roof Panel
(No.3)
using the same method as in
Step 7.
The previous side may need to be
un-screwed and adjusted so that the
roofs sit correctly.
Do not secure the building to the
Floor until the Roof is fitted.
9x40mm screws
1!
2!
Pre drill
hole
3
40mm
screw
3
3
3
Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
Please retain product label and instructions for future reference
www.merciagardenproducts.co.uk P7
Содержание 02DTSHAX0606SFHD2W-V1-PEFC
Страница 11: ...2 1 3 4...
Страница 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...