Mercia Garden Products 02DTAXVP0701-V1-PEFC Скачать руководство пользователя страница 1

02DTSHAX0705LFD5WBF-V1-PEFC

7x5 Swiss Playhouse

In all instances for assistance with your product, please contact customer care on :  

01636 821215 or [email protected]

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

Please retain product label and instructions for future reference

        

General Instructions

CAUTION 

Wood is a natural product and can change post manufacture. So despite every effort being 

made to ensure the material used are cut and machined to a clean and smooth finish, care 

must be taken when handling the product and preparing for use by your child.

Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a 

smoother finish. Alternatively, call the customer service department who will be happy to 
arrange replacement panels/parts.

 

WARNING 

 ONLY SUITABLE FOR DOMESTIC USE.

• 

TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.

 THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY. ANY MODIFICATIONS SHOULD BE 

DETERMINED BY THE MANUFACTURER AND CARRIED OUT ACCORDING TO  THE INSTRUCTIONS.

• 

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.

 MAX AGE OF 14 YEARS.

• 

THIS TOY IS FOR OUTDOOR USE ONLY.

• 

USE A WATER BASED TREATMENT THAT IS EN71 TESTED 

!

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be erected by 

atleast two adults.

DO NOT ALLOW 

CHILDREN TO ASSIST.

To prevent damage during 

assembly, you 

MUST

 pilot 

drill all screw holes and 

ensure all screw heads are 

countersunk

.

For ease of assembly, you will 

need a tape measure to check 

dimensions of components.

WARNING: Only for domestic use

Not suitable for children under 36 months due to 

small gaps and danger of falling from heights.

To be used under direct supervision of an adult

www.merciagardenproducts.co.uk      P1

2mm Drill bit

12mm CSK

**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the 

correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels 

and garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium 

dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed in the parts list provided. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

- Ensure you have enough time to build the product to ensure the building is water tight.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to natural processes. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of hot weather 

and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to prevent discolouration 

whilst in stock. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a suitable preservative in accordance with the manufacturers recommendations. 

Care must be taken to ensure the product is placed on a suitable base.

We recommended using a suitable protection for your playhouse. As the product is destined for use by 

children, a water based treatment for childrens toys is ESSENTIAL.

We also recommend treating the building prior to construction.

POSITIONING YOUR PLAYHOUSE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment. 

We recommend a 

minimum space of 2m around a playhouse

, away from any structure or obstructions such as 

fences, garages, houses, overhanging branches, washing lines or electrical wires.

It is recommended that the position of the Playhouse is

 not in direct sunlight.

Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or any hard 

surface.

BUILDING A BASE 

Ensure the base is level and is built on firm ground, to prevent distortion, checking with a spirit level.  Refer to 

diagrams for the base dimensions.  The base should be slightly smaller than the external measurement of the 

building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the 

floor be at least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

- Wooden base.

Содержание 02DTAXVP0701-V1-PEFC

Страница 1: ...4 6 trichlorophenol BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY Check the pack and make sure you have all the parts listed in the parts list provided When you are ready to start make sure you have the right tools at hand not supplied including a Phillips screw driver Flathead screwdriver Stanley knife Wood saw Step ladder Hammer Spirit level and a Drill with 2mm bit Ensure there is ple...

Страница 2: ...ouse 7x5 Playhouse 7x5 Playhouse SI 002 001 00109 7x6 Playhouse With Veranda SI 002 001 0110 Model Product Codes 02DTSHAX0705LFD5WBF V1 PEFC Playhouse 02DTSHAX0705LFD5WBF V1 PEFC Playhouse 02DTAXVP0701 V1 PEFC Veranda 7x6 Playhouse With Veranda Please retain product label and instructions for future reference www merciagardenproducts co uk P2 ...

Страница 3: ...able Top QTY 1 AI S11SHAWGT2020X805 V1 Roof QTY 2 AI S11MBOHAR1456X1790 V1 Door QTY 1 AI 02LFD588X1374 V1 Double Window QTY 1 AI DFW955X460 V1 Bunk Floor Support Bar 44x44x1275mm QTY 2 F4444 1275mm Bunk Floor Block B 28x28x595mm QTY 2 FS2828 595mm Bunk Floor Block C 28x28x473mm QTY 3 FS2828 473mm Bunk Floor Block D 28x28x94mm QTY 2 FS2828 94mm Bunk Floor Block E 28x28x68mm QTY 6 FS2828 68mm Gable ...

Страница 4: ...ll Dimensions Width 2327mm Depth 1838mm Height 2435mm Base Dimensions Width 2066mm Depth 1780mm 7x6 Swiss Playhouse With Veranda 02DTSHAX0705LFD5WBF V1 PEFC 02DTAXVP0701 V1 PEFC 7x1 Veranda Pack B 02DTAXVP0701 V1 PEFC Content 40 41 42 43 Veranda Floor QTY 1 AI S11STVF2066X300 V1 Front Rail QTY 1 AI 02SR1090X600 V1 Side Rail QTY 2 AI 02SR273X600 V1 Support Rail A 27x44x1631mm QTY 2 F2744 G 1651mm a...

Страница 5: ...e Window Blocks No 36 with 2x30mm screws per window block as shown Place one Window No 11 into the window hole in each Window panel No 4 fix by screwing though the Window Block No 36 with 2x30mm screws per window block as shown Place one Window No 11 into the window hole in the Window Gable Top No 6 fix by screwing though the Window Block No 36 with 2x30mm screws per window block as shown 24x30mm ...

Страница 6: ...0mm black screws 2 9 34 A B 1 2 Pre drill hole 3 2 9 34 34 34 34 38 38 38 38 38 1 2 Pre drill hole Step 3 Parts needed Place the Floor No 1 on a firm and level base ensure the base has suitable drain age free from areas where standing water can collect see the front page for base requirements 1 1 Step 4 Parts needed Place the Back Panel No 3 and one Window Panel No 4 on top of the floor ensuring t...

Страница 7: ...eeded Locate the Plain Gable Top No 5 on top of the Back Panel No 3 and the Window Gable Top No 6 on top of the Door Panel No 2 ensuring to interlock the bottom board of the gable with the top board of the panel as shown in the diagram Secure the Gables No 5 6 to the panels below by screwing through the framing using 6x50mm screws as shown in the illustrations Ensure to stagger screws to avoid col...

Страница 8: ...he door panel into each end of the block using 2x40mm screws 2x40mm screws 1 2 Pre drill hole 17 13 40mm screw 28mm 17 1 2 Pre drill hole 40mm screw Step 9 Parts needed Locate one Bunk Floor Block E No 18 flush to the panel framing Ensure the top of block E is 28mm from the top of the support bar No 13 The longest side of the block should be against the panel framing Fix to the Door Panel using 1x...

Страница 9: ... 2 Pre drill hole 18 16 28mm 13 40mm screw Step 11 Parts needed Locate two Bunk Floor Block E s No 18 flush to the panel framing Ensure the top of block E is 28mm from the top of the support bar No 13 The longest side of the block should be against the panel framing Fix to the Door Panel using 1x40mm screw per block screwing through the block into the framing Locate Bunk Floor Block C No 16 on top...

Страница 10: ...mm screw per end down through block B No 15 into block E No 18 4x40mm screws 18 15 1 2 Pre drill hole 15 28mm 18 18 13 Step 14 Parts needed Away from the building locate two Bunk floor block A s No 14 to either end of the Bunk Floor No 7 ensuring the ends and tops are flush as shown in the illustration Locate the remaining Bunk Block C No 16 centrally between the two Block A s ensuring a 29mm gap ...

Страница 11: ...0kg 60mm screw 7 7 Bunk Floor 60mm screws Panel Framing Step 17 Parts needed Locate the Safety Rail No 10 on top of the bunk floor ensure the safety rail is flush with the framing of the door panel and window gable top as well as the edge of the bunk as shown in the illustration Fix in place using 8x50mm screws through the rail into the bunk floor and panel framing Locate the assembled ladder flus...

Страница 12: ... the gable No 5 6 framing and is flush to the back of the building The roof should overhang the front of the building by 300mm Make sure the 21mm overhang on the roof is at the apex of the building Secure by screwing through the roof panel No 8 into the gable and panel below using 11x40mm screws Secure the Safety Rail No 10 to the roof by screwing down thorough the roof into the Rail below using 3...

Страница 13: ...50mm Screws 50mm screw 1 2 Pre drill hole b b b b b b b b b b b b Step 22 Parts needed Fix the Gable Cover Trims No 19 to the Window Gable Top No 6 with 2x30mm screws per Trim Fix the Cover Strips No 20 to the corners of the building with 3x30mm screws per trim The Trims attached to the front corners of the building and gable top will need to be cut to fit the angle as shown in the diagram 20x30mm...

Страница 14: ...and work your way up so that rain pours over the top of the laps and not under them Ensure there is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 110 Felt Tacks Felt tacks 1 2 Pre drill hole HANDLE WITH CARE 1 2 3 4 37 1 2 3 4 37 www merciagardenproducts co uk P14 Please retain product label and instructions for future reference DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY C...

Страница 15: ...h the cladding into the Box using 4x20mm screws per box Locate 2 Window Shutters No 29 around the windows on both the Window Panels Secure in place by screwing from inside the playhouse through the cladding into the Shutter framing using 6x30mm screws per shutter 24x30mm screws 16x20mm screws 28 29 A B 1 2 Pre drill hole Every effort has been made to reduce sharp edges but it is recommended that a...

Страница 16: ... 30mm screw 20 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Playhouse Maintenance It is recommended that the following checks and maintenance are carried out at the beginning of each season as well as at regular intervals during the usage season Check all nuts...

Страница 17: ...nel No 2 using 2x50mm screws per side and into the Veranda floor No 39 using 2x40mm screws per side 4x50mm screws 4x40mm screws 41 50mm screw 1 2 Pre drill hole 41 41 41 40mm screw Step 25a Parts needed Position the Support Rail A s No 42 on top of either side of the Veranda Floor No 39 and flush to the Side Rails No 41 Fix in place by screwing through the Support Rail A No 42 into the side Rails ...

Страница 18: ...0 40mm screw 1 2 Pre drill hole 42 40 Internal View 40 42 Step 27a Parts needed Position the Support Rail B No 43 on top of the Veranda Floor No 39 and flush to the Front Rail No 40 Fix in place by screwing through the Front Rail No 40 into the Support Rail B No 43 and through the roof into the top of the Support Rail using 3x40mm screws per rail Make sure access to the Door is not blocked and tha...

Страница 19: ...l hole HANDLE WITH CARE 1 2 3 4 37 1 2 3 4 37 Step 29a Parts needed Fix the Fascias No 27 to the front and back of the building using 3x40mm screws per Fascia Fix the Finials No 30 centrally over the Fascias using 2x40mm screws per finial Ensure to trap the felt between the Fascia and the building 16x40mm Screws 40mm screw 27 30 1 2 Pre drill hole 27 27 30 27 27 30 www merciagardenproducts co uk P...

Страница 20: ...w C A 20mm screw Step 31a Parts needed Place a Window Frame Cross No 31 against the inside of each window Position the frame centrally to the window and fix using 4x20mm screws per frame Locate the Wooden Door Handle No 33 onto the outside of the door Fix in place by hand screwing through the door with the screw attached to the door handle On the inside of the door opening fix the ply triangle doo...

Страница 21: ...uts bolts screws for tightness and tighten when required Check for movement opening of wood giving rise to protrusion of nail heads and tips Check hinges Replace defective parts in accordance with the manufacturers instructions Check any crossbeams suspensions and anchors If a swing is included check the swing seat chains and ropes IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME ...

Страница 22: ... 2 1 3 4 ...

Страница 23: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2 ...

Отзывы: