![Mercia Garden Products 02BRAM0806-V3-PEFC Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/mercia-garden-products/02bram0806-v3-pefc/02bram0806-v3-pefc_general-instructions-manual_1772496005.webp)
P 5
Please retain product label and instructions for future reference
Step 8
Fix the Safety Rail (
No. 9
) flsuh to the side
of the Bunk Floor (
No .6
).
Fix into position using 6x50mm screws as
shown.
6x50mm screws.
Pre drill
hole
50mm
screw
Step 9
Fix the Roof bearers (2x
No. 18
) into position
using the 8x Corner Brackets (
No. 30
)
as
shown below.
Fix into position using 36x30mm screws.
36x30mm screws.
Step 10
To make the Safety Rail secure, fix the Railing
Upright (
No. 17
) into place so that it is flush with
the side of the the Bunk Floor and flush with
the Roof Bearer.
Fix into position as shown using 3x40mm
screws.
3x40mm screws.
Step 11
Fix your ladder together as shown using
4x50mm per Ladder Step (
No. 22, No. 23
&
No. 24
).
16x50mm screws.
Pre drill
hole
30mm
screw
Pre drill
hole
40mm
screw
Pre drill
hole
50mm
screw
9
18
18
18
30
17
22
23
24
Содержание 02BRAM0806-V3-PEFC
Страница 9: ......