background image

P 1

02-BRAM0806-V3-PEFC

8x6 Bramble Playhouse

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

WARNING: Only for domestic use

Not suitable for children under 36 month

To be used under direct supervision of an adult

Содержание 02BRAM0806-V3-PEFC

Страница 1: ...in swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pre treated with a w...

Страница 2: ... V3D Window Box AI 02BRAM0806 V3WB Window Shutters AI 02BRAM0806 V3WS QTY x2 QTY x3 2x Fascia 12x95x1960mm SR1295 1960mm 2x Fascia 12x95x1040mm SR1295 1040mm 4x Fascia Blocks 27x44x423mm F2744 423mm Railing Upright 27x44x1060mm F2744 1060mm 3x Roof Bearer 27x44x1665mm F2744 1665mm 2x Roof Eave 28x28x2200mm F2828 2200mm 2x Cover Trim A 12x56x1680mm S1256 1680mm 2x Cover Trim B 12x56x2016mm S1256 20...

Страница 3: ...ix the side of the Short Window Panel No 4 against the back of the Back Panel No 3 Do not secure the building to the Floor until the Roof is fitted 3x50mm screws Step 3 Fix the side of the Tall Window Panel No 5 against the back of the Back Panel No 3 Do not secure the building to the Floor until the Roof is fitted 3x50mm screws Pre drill hole 50mm screw Step 1 To fix the Windows No 10 No 13 into ...

Страница 4: ...ews 21x30mm black screws Step 5 Place the Bunk Floor No 6 onto the horizontal framing of the Back Panel No 3 and flush with the horizontal framing of the Tall Window panel No 5 Fix into position using 7x70mm screws as shown 7x70mm screws Pre drill hole 70mm screw Pre drill hole 50mm screw Step 6 Fix the back of the Door Panel No 2 against the sides of the Tall and Short Window Panels No 4 No 5 Fix...

Страница 5: ... No 30 as shown below Fix into position using 36x30mm screws 36x30mm screws Step 10 To make the Safety Rail secure fix the Railing Upright No 17 into place so that it is flush with the side of the the Bunk Floor and flush with the Roof Bearer Fix into position as shown using 3x40mm screws 3x40mm screws Step 11 Fix your ladder together as shown using 4x50mm per Ladder Step No 22 No 23 No 24 16x50mm...

Страница 6: ...x40mm screws starting from the top your building Make sure to screw into the framing Make sure the rear of the building is flush with the Roof OSB This will ensure your roof is straight 4x30mm screws 26x40mm screws Step 14 Fix the Fascia Blocks No 16 to the Roof OSB No 7 using 3x30mm screws per block Use 2x40mm screws to fix the blocks to eachother 4x40mm screws 12x30mm screws Step 15 Fix the Cove...

Страница 7: ...rvals Use a final fourth peice of felt along the Apex of the building as shown 110x Felt Tacks Step 17 Fix the Fascias No 14 No 15 using 3x40mm screws per board Fix the Finials 2xNo 25 with 2x40mm screws per Finial as shown 16x 40mm screws 2 4 3 1 Step 18 Fix the Window Crosses No 26 into position using 4x20mm screws per Window Cross 32x 20mm screws 14 15 14 15 25 26 Pre drill hole 40mm screw Pre ...

Страница 8: ...d instructions for future reference Step 19 Fix the Window Shutters No 12 and Window Box No 11 in position screwing from inside through the cladding as shown 12x 30mm screws Step 20 Fix the Chrome Handle No 28 to the Door No 8 using 4x30mm black screws Fix the Door Stop No 27 to the inside of the door using 3x20mm screws as shown 4x 30mm black screws 3x20mm screws 12 11 28 27 Pre drill hole 20mm s...

Страница 9: ......

Отзывы: