background image

70mm 

screw

100mm 

screw

Step 11

Place a Truss central to where two 

panels join. Align the top of the 

truss with the top of the sides as 

shown in the diagram.

HINT - Use a piece from the fixing 

kit as a guide.

Pencil mark the truss position and 

remove truss.

Place the truss blocks up to the 

pencil mark and fix using 2x70mm 

screws per block.

Place the truss back into position on 

top of the support block and secure 

using 100mm screw each side from 

the top down through the truss and 

into the block.

4x70mm Screws

2x100mm Screws

14

Pre drill 

hole

Pre drill 

hole

11

11

*

Cut down trims to fit

Using x3 strips (No. 20) cut two trims at 

1783mm 

and 

one strip at 

1445mm

Place the smaller strip (1445mm) centrally above the 

door aperture (

allowing a space of 10mm between the 

strip and the top of the door opening

) and fix into 

position using 3x30mm screws. 

Align the larger strips (1783mm) either side of the first 

smaller strip and fix each one into position using 

3x30mm screws. This will allow a space of 

approximately 10mm between the trims and the 

opening.

*

Please note: This 10mm gap allows the doors to sit 

onto the gable NOT into the aperture.

Fix the T Hinges onto the front of the doors; aligning 

each hinge to the framing on the back of each door. 

Secure the doors onto the assembled gable as shown 

in the illustration. Ensuring that the screws go through 

the cladding and into the framing behind.

51x30mm Screws

Step 10

30mm 

screw

Pre drill 

hole

19

19

19

20

10mm

gap

Содержание 01SHPWOR1210DDOW-V2

Страница 1: ...pre treated with a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESSENTIAL the building is treated with a wood preserver within the first three months of assembly and thereafter in accordance with the manufactures recommendations Care must be taken to ensure the pr...

Страница 2: ...Trim 1757mm Qty 11 18 Finial Qty 2 23 20 T Hinge Qty 6 Felt 24 casement stay QTY 2 Butt hinge QTY 4 Window QTY 2 25 22 27 21 Tower Bolt QTY 2 26 7 10 Door Qty 2 16 Door Gable Strip 2552mm Cover Strip 2800mm Qty 3 19 28 U Bracket QTY 4 29 Plain Gable Board Gable Block 342mm Door Cloaking Strip 30 Nail Bag 30mm Screw x 92 20mm Screw x 12 50mm Screw x 82 70mm Screw x 6 40mm Screw x 140 Felt Tacks x 1...

Страница 3: ...m screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they are level at the top and bottom then fix together using 10x50mm screws Stagger the screws so they do not collide 50mm screw Pre drill hole 29 Turn the gable section over and secure the top board in plac...

Страница 4: ...l hole 8 Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and cladding on all 4 sides Step 5 3x50mm Screws 4 5 7 50mm screw Pre drill hole Step 6 Fix the remaining window side and the splain side at the corner with 50mm screws as shown in diagram 6x50mm Screws...

Страница 5: ...with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole Cut down trims to fit Measure the length of the door gable rail and cut down a strip match Fix in place using 2x30mm screws Step 9 Fit the Door Gable Rail between the Front Gable Left and Right Fix to the floor using 3x50mm screws Ensure screws line up with the framing 3x50mm Screws 50mm screw Pre drill hole 15 19 50mm sc...

Страница 6: ...783mm and one strip at 1445mm Place the smaller strip 1445mm centrally above the door aperture allowing a space of 10mm between the strip and the top of the door opening and fix into position using 3x30mm screws Align the larger strips 1783mm either side of the first smaller strip and fix each one into position using 3x30mm screws This will allow a space of approximately 10mm between the trims and...

Страница 7: ...n either side of the building 16x40mm Screws 40mm screw Pre drill hole Secure the roof panels together using the metal U channels and 6x40mm screws per U channel 24x40mm Screws 40mm screw Pre drill hole Place the next two roof sheets ontop of the truss and ensure that it butts up to the one already fixed Fix in place with 40mm screws ensuring they go through to the framing 16x40mm Screws 40mm scre...

Страница 8: ...ll hole HANDLE WITH CARE 1 2 3 4 185 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below Once the sheets are laid out fix them onto the roof with tacks 100mm apart 1 2 3 4 Felt Strip Sizes 3755mm Felt tacks B B B B B B B ...

Страница 9: ...in using 4x40mm screws Pre drill to avoid splitting 28x40mm Screws 18 17 17 40mm screw Pre drill hole Cut down trims to fit Step 17 16x40mm Screws Fit the fascias to the roof over the felt and secure in place with 40mm screws as shown Pre drill to avoid splitting Measure and trim down to size 40mm screw Pre drill hole 17 17 17 17 17 17 23 17 17 23 ...

Страница 10: ...anel as shown in the diagram 6x30mm Screws 6x16mm Screws 4x30mm Screws Place the cover strip 11mm above the window gap in the window panel and fix with 3x30mm screws per strip Measure and trim before fitting 3x30mm Screws SCREW COUNT PER WINDOW Cut down trims to fit 30mm screw Pre drill hole 19 Place the Cloaking Strip to the rear of one of the doors Fixing in position screwing through the door in...

Страница 11: ...them down using 12 x 20mm screws 6x20mm screws per casement stay 26 Step 21 Step 20 To fix the lock in place Screw the Staple to the Door Gable or Slave door Making sure the Hasp is in line with the staple and screw into the Door or Master door To lock the Door place the Hasp over the Staple and twist into the lock position as shown 8x30mm screws Pre drill hole 30mm screw ...

Страница 12: ...P 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back ...

Отзывы: