background image

H=220cm W=140cm L=130cm

30mm Black Screw x 12

P 2

01SHPWOR1010DDOW-V2

Please retain product label and instructions for future reference

             

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

Overall Dimensions:

 

Length = 3114mm 

Width = 3179mm

Height = 2485mm

Base Dimensions: 

Length = 3010mm

Width = 2980mm

Building content

2

1

3

4

5

6

Plain Side

Qty 2

Window Side

Qty 2

Floor

Qty 4

Roof Panel

Qty 2

8

Front

Gable

Right

Front

Gable

Left

Front

Gable

Top

Back Gable

Right

Back Gable

Left

9

Truss Block - 160mm Qty 2

Door Gable Rail - 1332mm Qty 2

Tower Catch Block - 118mm Qty 2

14

11

12

15

13

17

Truss

Plain Gable Strip - 2387mm Qty 1

Cover Trim - 1757mm Qty 11   

18

Finial 

Qty 2

21

20

T Hinge

Qty 6

Felt

24

25

Casement stay 

QTY 2

Butt hinge QTY 4

22

26

23

Tower Bolt QTY 2

27

7

10

Door

QTY 2

16

Door Gable Strip - 2552mm

Cover Strip - 2800mm Qty 3

19

Gable Block - 342mm 

Plain Gable Board

28

Window

QTY 2

Hasp & Staple 

Lock

Door Cloaking  Strip 

29

Nail Bag

30mm Screw x 91

20mm Screw x 12

50mm Screw x 82

70mm Screw x 6

40mm Screw x 106

Felt Tacks x 170

16mm Screws x 12         

100mm Screw x 2

Remove transportation 

blocks from the bottom 

of each panel before 

beginning assembly. Each 

Panel should have two 

blocks.

Pre Assembly 

Door Gable Assembly 

Step 1

2 x 50mm screws

Lay the Front Gable Right and Front Gable 

top on a level floor place them next to each 

other, ensure they are level at the top then 

fix together using 2x50mm screws. Stagger 

the screws so they do not collide.

1

3

50mm 

screw

Pre drill 

hole

Содержание 01SHPWOR1010DDOW-V2

Страница 1: ...treated with a water based treatment this only helps to protect the product during transit and for upto 3 months against mould To validate your guarantee and ensure longevity of the product it is ESS...

Страница 2: ...m Qty 1 Cover Trim 1757mm Qty 11 18 Finial Qty 2 21 20 T Hinge Qty 6 Felt 24 25 Casement stay QTY 2 Butt hinge QTY 4 22 26 23 Tower Bolt QTY 2 27 7 10 Door QTY 2 16 Door Gable Strip 2552mm Cover Strip...

Страница 3: ...m screws 5x40mm Screws 40mm screw Pre drill hole Plain Gable Assembly Step 3 12 x 50mm screws Lay the Back Left Gable and Back Right Gable on a level floor place them next to each other ensure they ar...

Страница 4: ...hole 8 Step 4 Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Position the panels so there is equal spacing between the floor and...

Страница 5: ...crew Pre drill hole Step 8 Fix the Door Gable refer to steps 1 and 2 if you have not already assembled this at the corners with 50mm screws as shown in diagram 6x50mm Screws 50mm screw Pre drill hole...

Страница 6: ...83mm and one strip at 1445mm Place the smaller strip 1445mm centrally above the door aperture allowing a space of 10mm between the strip and the top of the door opening and fix into position using 3x3...

Страница 7: ...and fix using 40mm screws Ensure there is an equal amount of overhang on either side of the roof 12x40mm Screws 40mm screw Pre drill hole Place the second roof sheet ontop of the truss and ensure that...

Страница 8: ...l hole HANDLE WITH CARE 1 2 3 4 170 x felt tacks Cut four strips of felt and place onto the roof See below for sizes Place the felt flat onto the roof in the order that is stated on the diagram below...

Страница 9: ...where the two back gables join using 4x40mm screws Pre drill to avoid splitting 28x40mm Screws 19 17 17 40mm screw Pre drill hole 16x40mm Screws Fit the fascias to the roof over the felt and secure i...

Страница 10: ...x the opening windows instead of fixing butt hinges to the opening window use 4x30mm screws to attach the opening windows to the window panel as shown in the diagram 3x30mm Screws SCREW COUNT PER WIND...

Страница 11: ...hem down using 12 x 20mm screws 6x20mm screws per casement stay 22 Step 21 Step 20 To fix the lock in place Screw the Staple to the Door Gable or Slave door Making sure the Hasp is in line with the st...

Страница 12: ...P 12 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back...

Отзывы: