background image

01RAW1010DDOW-V1

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

10x10 Reverse apex workshop: Double doors, opening window with T&G roof & floor

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

01RAW1210DDOW-V1

12x10 Reverse apex workshop: Double doors, opening window with T&G roof & floor

01RAW1610DDOW-V1

16x10 Reverse apex workshop: Double doors, opening window with T&G roof & floor

01RAW2010DDOW-V1

20x10 Reverse apex workshop: Double doors, opening window with T&G roof & floor

Refer to the instructions pages for you specific product code

Содержание 01RAW1010DDOW-V1

Страница 1: ...e building and base is going to be constructed Ensure that there will be access to all sides for maintenance work and annual treatment Whilst all products manufactured are made to the highest standard...

Страница 2: ...indow Truss Gable Strip 2387mm QTY 2 Cover Strip 1757mm QTY 11 Door Strip 1600mm QTY 2 Gable Block QTY 2 Truss Block QTY 2 Gable Board QTY 2 T Hinge QTY 6 Rim Lock Butt Hinge QTY 2 Finial QTY 2 Caseme...

Страница 3: ...onto the floor and fix in place Fix the corners with 50mm screws Do not secure the building to the floor until the roof is fixed 3x50mm Screws a b a b b a a a Step 4 Following the same method outline...

Страница 4: ...using 1x100mm screw per side as shown in the illustration 4x70mm Screws 2x100mm Screws Step 6 Place the master and slave door into the door panel and fix into place with 3x T hinges per door and 7x30m...

Страница 5: ...crews as shown in the illustration 26x40mm Screws Step 12 Place the cover strip 13mm above the gap in the window panel and fix into place using 3x30mm screws Measure and trim the strip before fitting...

Страница 6: ...b 30mm screw P 6 Please retain product label and instructions for future reference Pre drill hole 30mm screw Flat head Grub Screw 2x30mm screw Screws provided with lock Do not over tighten the screws...

Страница 7: ...refuly peel covering back Please retain product label and instructions for future reference 13 13 21 13 13 21 Step 16 Fit the cover trims and finials to the gable sides securing with 12x40mm screws as...

Отзывы: