P 13
Please retain product label and instructions for future reference
Place the floor on a firm and level base,
ensure the base has suitable drainage free
from areas where standing water can collect.
See the front page for base requirments.
Step 1
4
Do not secure the building to the
floor until the roof is fitted.
Fix the corners with 50mm screws
as shown in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
Step 2
2
3
3x50mm Screws
Pre drill
hole
50mm
screw
Step 3
9x50mm Screws
Fix the corners with 50mm
screws as shown in diagram.
Pre drill
hole
50mm
screw
Step 4
8x20mm Screws
Place the ridge bar in between the two
gables. Ensure the top corners of the
ridge bar sit flush with the top points of
the gable. Fix the ridge bar to the gable
using one L bracket for each end.
Fix with 4x20mm screws each
16
20mm
screw
Pre drill
hole
7
1
3