background image

P 13

Please retain product label and instructions for future reference

             

Place the floor on a firm and level base, 

ensure the base has suitable drainage free 

from areas where standing water can collect. 

See the front page for base requirments.

Step 1

4

Do not secure the building to the 

floor until the roof is fitted. 

Fix the corners with 50mm screws 

as shown in diagram.

Position the panels so there is equal spacing 

between the floor and cladding on all 4 sides

Step 2

2

3

3x50mm Screws

Pre drill 

hole

50mm 

screw

Step 3

9x50mm Screws

Fix the corners with 50mm 

screws as shown in diagram.

Pre drill 

hole

50mm 

screw

Step 4

8x20mm Screws

Place the ridge bar in between the two 

gables. Ensure the top corners of the 

ridge bar sit flush with the top points of 

the gable. Fix the ridge bar to the gable 

using one L bracket for each end.

Fix with 4x20mm screws each 

16

20mm 

screw

Pre drill 

hole

7

1

3

Отзывы: