background image

10X6 APEX, FIXED WINDOW - 10X6 APEX, NO WINDOW

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips 

screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm 

sunshine and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to 

prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for you specific product code

Pressure Treated Timber

Pressure treating is a chemical process which helps to protect wood against adverse weather which could 

lead to rot or insect damage.

The most common chemicals used to pressure treat wood are 

Alkaline Copper Quaternary

 (

ACQ

), 

Copper Azole

 (

CA

), and 

Micronized Copper Quaternary

 (

MCQ

).

Safety: 

Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in 

pressure treated wood, never burn its sawdust or scraps; instead dispose in a landfill.

Содержание 01PTOSBA1006DDFW-V1

Страница 1: ...as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatme...

Страница 2: ...972MM Eaves Frame 28x28x1502mm Qty 4 FS2828 1502MM Truss Block 27x44x140mm Qty 2 F2744 160MM Door Block 28x28x140mm Qty 2 FS2828 140MM Fascia 12x60x1016mm Qty 4 S1260 1016MM Door Strip 12x60x1016mm Q...

Страница 3: ...6x50mm Screws Pre drill hole 50mm screw Step 3 12x50mm Screws Fix the corners with 50mm screws as shown in diagram 1 4 4 Use for no window buildings 3 Use for no window buildings 3 Pre drill hole 50m...

Страница 4: ...ith the angle pointing upwards into the building aligning the block centrally along the join between the side panels with one screw in each panel ii Fix the support bar to the block using 1 x 50mm scr...

Страница 5: ...sing 3x30mm screws for each sheet b b 40mm screw Pre drill hole 6 18 Step 10 Once the roof is fixed attatch the building to the floor with 70 mm screws 24 x 70mm Screws b b b b b b b b b b b b b 70mm...

Страница 6: ...ws 2x30mm Black Screws 17 30mm screw Pre drill hole a a b 30mm screw Step 13 16 16 16 16 16 16 Fit the cover trims to the building and secure in place with 40mm screws as shown Pre drill to avoid spli...

Страница 7: ...e sheets on top of the window cill When positioning the styrene sheets ensure there is an equal distance between them and at either side of the windows Fix the window strips to the two pieces of frami...

Страница 8: ...It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back P 15...

Отзывы: