background image

50mm 

screw

Pre drill 

hole

P 3

Please retain product label and instructions for future reference

             

Step 2

Place the floor (

No. 4

) onto a firm

and level base. Ensure your base

has suitable drainage and is free

from areas where standing water 

can collect.

4

2

3

a

b

a

b

b

b

Step 3

Sit the plain gable (

No.3

) and the first plain

side (

No. 2

) onto the floor.

*Ensure the plain gable sits inside the plain

side.

 

Fix the panels at the corner using

 

3x 50mm screws.

 

Do 

NOT

 secure the building to the

 

floor until the roof has been fitted.

3x50mm Screws

a

b

a

a

a

a

a

a

a

a

a

b

b

b

50mm 

screw

Pre drill 

hole

Step 4

Rest the assembled door gable (

No.1

) and the 

second plain side (

No. 2

) onto the floor.

*Ensure the door gable sits inside the plain

sides.

 

Fix the panels at the corner using

 

9x 50mm screws.

 

Do 

NOT

 secure the building to the

 

floor until the roof has been fitted.

9x50mm Screws

a

b

2

1

14

7

a

b

Step 5   

 

Attach the “L” brackets (

No. 14

) to each

 

end of the ridge bar (

No. 7

), ensuring

 

the backs are flush with the edge of the 

 

framing using 2x20mm screws per “L”

 

bracket.

 

Fix to both gables centrally

 

with 2x30mm screws per side.

4x20mm Screws

4x30mm Screws

Pre drill 

hole

20mm 

screw

30mm 

screw

b

a

Отзывы: