Pre drill
hole
50mm
screw
3
1
Pre drill
hole
30mm
screw
Pre drill
hole
50mm
screw
P 3
Please retain product label and instructions for future reference
Step 3
Fix the corners with
3x50mm screws.
Do NOT secure to the
floor until the roof
is fitted.
9x50mm Screws
9
9
Step 4
Place the Gable Tops onto the
building, ensuring the framing
is level and flush with the
gable. Secure using 4x30mm
Screws as shown in the
illustration.
4x30mm Screws
8
11
Step 5
Fix the eaves frame to the edge
of the roof sheet using 4x30mm
screws.
Place the roof into position
ensuring the eaves frame sits
against the front panel.
Screw into position using
10x30mm screws as shown
in the illustration.
*Fix eaves frame to roof
sheet first.
14x30mm Screws
Step 6
Secure the building to the
floor using 12x50mm
screws.
Ensure to align the
screws with the floor
bearers.
12x50mm Screws
Pre drill
hole
30mm
screw