Mercia Garden Products 01OSBA0806DDFW-V1 Скачать руководство пользователя страница 3

P8

Place the floor on a firm and level base, 

ensure the base has suitable drainage free 

from areas where standing water can collect. 

See the front page for base requirments.

Step 1

5

Do not secure the building to the 

floor until the roof is fitted. Fix the 

panels onto the floor using 50mm 

screws in alignment with the floor 

joists

Fix the corners with 50mm screws 

as shown in diagram.

Position the panels so there is equal spacing 

between the floor and cladding on all 4 sides

Step 2

3

2

3x50mm Screws

Pre drill 

hole

50mm 

screw

Step 3

9x50mm Screws

Fix the corners with 50mm 

screws as shown in diagram.

1

4

Use         for no 

window buildings

3

Pre drill 

hole

50mm 

screw

Step 4

8x20mm Screws

Place the ridge bar in between the front 

and back gables. Ensure the top corners 

of the ridge bar sit flush with the top 

points of the door gable. Fix the ridge bar 

to the gable using one L bracket for each 

end.

Fix with 4x20mm screws each 

15

24

20mm 

screw

Pre drill 

hole

Отзывы: