Pre drill
hole
30mm
screw
30mm
screw
6
6
*The window side can be fitted
to either side of the building
depending on where you wish
the storage section to be located.
P 3
Please retain product label and instructions for future reference
Step 2
Lay the storage door panel flat and place
the storage doors into the gap.
Fix the doors into place with 2x
T-hinges per door, securing using
7x30mm screws per hinge.
Attach the blocks to the back of the
storage doors, fixing 1x block to the top
framing on each door using 2x30mm
screws per block and to the top and
bottom of one door, screwing through
the front into the block with 2x30mm
screws per block.
Fix a turn button to the top and
bottom blocks as shown in the
illustration using 1x30mm black screw
per turn button.
Attach the pad bolt the front of
one of the doors using 10x30mm screws
*Ensure to align the screws with the
framing on both the gable and door.
46x30mm Screws
2x30mm Black Screws
a
b
c
19
20
18
10
a
b
c
9
9
3
Step 3
Place the floors upside down on a firm
and level base.
Secure the sections together using
8x50mm screws, fixing in an alternating
pattern as shown in the illustration.
Once fixed, turn the floor section the right
way up and move to the desired base.
*Make sure the base is firm and level, ensuring
there is suitable drainage and the base is free
from areas where standing water can collect.
8x50mm Screws
Pre drill
hole
50mm
screw
2
5
a
b
Step 4
Place the plain gable and window panel
onto the floor.
Secure the panels at the corner
using 3x50mm screws.
Do
NOT
fix the building to the
floor until the roof is secured.
3x50mm Screws
Pre drill
hole
50mm
screw
10
a
a
b
b
b
b
b
b