Step 2

Lay the storage door panel flat and place

the storage doors into the gap.

 

Fix the doors into place with 2x 

 

T-hinges per door, securing using 

 

7x30mm screws per hinge.

 

Attach the blocks to the back of the 

 

storage doors, fixing 1x block to the top

 

framing on each door using 2x30mm 

 

screws per block and to the top and 

 

bottom of one door, screwing through

 

the front into the block with 2x30mm

 

screws per block.

 

Fix a turn button to the top and

 

bottom blocks as shown in the

 

illustration using 1x30mm black screw

 

per turn button.

 

Attach the pad bolt the front of 

 

one of the doors using 10x30mm screws

*Ensure to align the screws with the 

framing on both the gable and door.

46x30mm Screws

2x30mm Black Screws

a

b

c

19

20

18

10

a

b

c

9

9

3

Step 3

Place the floors upside down on a firm

and level base.

Secure the sections together using

8x50mm screws, fixing in an alternating

pattern as shown in the illustration.

Once fixed, turn the floor section the right

way up and move to the desired base.

*Make sure the base is firm and level, ensuring

there is suitable drainage and the base is free

from areas where standing water can collect.

8x50mm Screws

Pre drill 

hole

50mm 

screw

2

5

a

b

Step 4    

Place the plain gable and window panel

onto the floor.

 

Secure the panels at the corner

 

using 3x50mm screws.

 

Do 

NOT 

fix the building to the 

 

floor until the roof is secured.

3x50mm Screws

Pre drill 

hole

50mm 

screw

10

a

a

b

b

b

b

b

b