BUILDING A BASE
When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and
annual treatment.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly
smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended
that the floor be at least 25mm above the surrounding ground level to avoid flooding.
Place Roof panels into position on top
of building using the slot at the top as
a guide. Ensure the overhang is at the
front and that the center roof purlin
fits inbetween the front and rear
gable.
Secure each panels with 10x40mm
screws per panel.
20 x 40mm screws
Place a facia block at the front and
back of each roof panel. Secure using
2x40mm screw per block.
40mm
screw
8 x 40mm screws
40mm
screw
Step 5
5
6
Step 6
Cut four equal strips from roll of felt,
making sure they cover the length of
the roof with 50mm overhang on
each end.
Lay on roof in the order shown in
diagram and secure using felt tacks
with 100mm spacing between each.
12
Step 7
100 x Felt tacks
Felt
Tacks
17
Step 8
Fix fascias to front and back
using 40mm screws into the
roof framing and fascia
block.
Then fix the finials at the top
of apex, overlaping both
fascias with a 40mm screw.
10 x 40mm screws
40mm
screw
8
11