BUILDING A BASE

When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and 

annual treatment.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  The base should be slightly 

smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended 

that the floor be at least 25mm above the surrounding ground level to avoid flooding.

Place Roof panels into position on top 
of building using the slot at the top as 
a guide. Ensure the overhang is at the 
front and that the center roof purlin 
fits inbetween the front and rear 
gable.

Secure each panels with 10x40mm 
screws per panel.

20 x 40mm screws

Place a facia block at the front and 
back of each roof panel. Secure using 
2x40mm screw per block.

40mm

screw

8 x 40mm screws

40mm

screw

Step 5

5

6

Step 6

Cut four equal strips from roll of felt, 
making sure they cover the length of 
the roof with 50mm overhang on 
each end.

Lay on roof in the order shown in 
diagram and secure using felt tacks 
with 100mm spacing between each.

12

Step 7

100 x Felt tacks

Felt 

Tacks

17

Step 8

Fix fascias to front and back 
using 40mm screws into the 
roof framing and fascia 
block.

Then fix the finials at the top 
of apex, overlaping both 
fascias with a 40mm screw.

10 x 40mm screws

40mm

screw

8

11

Отзывы: