Step 7
Fix the roof panels to the
building. Ensure the framing
fits into the slot at the top
of the gables.
Secure in place using 7x30mm
screws per roof panel.
28x30mm Screws
Pre drill
hole
30mm
screw
b
b
b
b
b
b
Step 6
Now That the roof is fixed
secure the building to the
floor with 24x50mm screws.
* Ensure to screw in alignment
with the floor bearers.
24x50mm Screws
Pre drill
hole
50mm
screw
Felt
tacks
Pre drill
hole
50mm
screw
P 4
Please retain product label and instructions for future reference
Step 7
Cut the felt into 3 sheets and
lay onto the roof as shown in
the diagram ensuring there is
50mm overhang around the
sides.
Fix using 180x felt tacks at
100mm intervals.
180x Felt Tacks
Step 6
Fix the assembled truss inbetween
the panels, approximately half
way between the gables, and secure
using 4x50mm screws.
4x50mm screws
HANDLE
WITH CARE
1
2
3
4