P 3
Please retain product label and instructions for future reference
Step 1
Fit the door frame onto the
door gable using 4x30mm
screws for each strip. The
door frames should sit
15mm from the door
aperture.
12x30mm Screws
15mm
10
11
30mm
screw
Pre drill
hole
42x30mm screws
Step 2
Fix the T-hinges onto the
doors and door frame as
shown. using 30mm
screws. Ensure that each
hinge is fixed to the doors
going through to the
framing.
21
Pre drill
hole
30mm
screw
Remove transportation blocks
from the bottom of each panel
before beginning assembly.
Each panel should have two
blocks.
Step 3
5
Place the floor on a firm and
level base, ensure base has
suitable drainage free from
areas where standing water
can collect. (See front page for
base requirements).
Step 4
5
5