Please retain product label and instructions for future reference
P 8
P 7
Fix the casement stay
to the
window using 20mm screws
as shown in the ilustration.
once in position secure the
pins to the roof framing with
20mm screws, ensuring the
stay and pins align and lock
the window -
See greenhouse
nail bag.
See greenhouse instructions
for installing glazing and for
screw quantities.
Pre drill
hole
20mm
screw
Place the greenhouse roof frame(
s
)
against each window panel and
secure in place using 3x50mm screws
per frame, ensuring to screw
into each panel.
6x50mm Screws
Pre drill
hole
50mm
screw
Using the roof’s as a guide, mark the
position for the roof block at the top
of the
shed door gable
.
Once marked secure the block to the
gable using 1x70mm screw, making
sure to secure through the block into
the central upright on the door gable.
1x70mm Screws
Pre drill
hole
70mm
screw
Step 17
Step 18
Step 19
P 10
Содержание 01DTSHAX0406SDFW-V1
Страница 14: ...2 1 3 4...
Страница 15: ...1 2...