Mercia Garden Products 01DTOVRA0604SDFW-V1 Скачать руководство пользователя страница 6

P 6

Please retain product label and instructions for future reference

             

Step 8

Parts needed - No. 6 QTY 2

Place the Roof Panels 

(No.6)

 on top of the building, 

ensuring equal spacing either side of the building

**Make sure that you have got the roof panels 

the correct way round with the Eaves Framing to 

the front and back of the building.**

From the top, fix directly through the roof panels 

(No.6) 

and into the ridge bar 

(No.10) 

below using 

5x30mm screws per roof panel.

It is essential that the ridge bar 

(No.10) 

and roof 

panel 

(No.6) 

framing pull together when fixed with 

30mm screws.  You may require another person 

pushing the ridge bar 

(No.10) 

up from below to 

achieve this.

Fix the remaining edges of the roof panels using 

12x30mm screws.

20x30mm Screws

Place the plastic cill 

(No.18)

 into the 

window panel as shown in the 

illustration.

Fit the styrene sheet 

(No.23)

 on top of 

the window cill.

*For added weather protection fit your

windows using silicone sealant around

the outside edges.

**When positioning the styrene sheets 

ensure there is an equal distance on all 

sides.

Attach the window strips

 (No.13 and No.14)

to either side of the windows and the

top. Secure into place using 3x30mm

screws per strip.

2x20mm screws

9x30mm Screws

Pre drill 

hole

20mm 

screw

a

b

c

Styrene

Window Cill

Cladding

Side View

a

b

c

SILICONE

SEALANT

30mm 

screw

Step 10

Parts Needed- No.13 QTY 2

 

 

- No.14 QTY 1

 

 

- No.18 QTY 1

 

 

- No.23 QTY 1

18

23

13

14

13

Felt 

tacks 

HANDLE

WITH CARE

1

2

3

4

Step 11

Parts Needed- No.17 QTY 1

1

2

Cut the felt 

(No.17)

 into 2 sheets of 

1900mm and lay onto roof as 

shown in diagram ensuring there is 

a 50mm overhang around each 

side. Nail using felt tacks

85xFelt tacks

17

Содержание 01DTOVRA0604SDFW-V1

Страница 1: ...id placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions...

Страница 2: ...83X1799 V1 Plain Panel 2 QTY 1 AI R11OVPP1180X1799 V1 Roof QTY 2 PI 03 0222 Floor QTY 1 AI R11OSBF1175X1753 V1 Door QTY 1 AI R11FBMBZBD660X1660 V1 Door Block 150x28x28mm QTY 1 F2828 150mm Ridge Bar 17...

Страница 3: ...See the front page for base requirements 7 1 20 20 20 8 Step 2 Parts needed No 1 QTY 1 No 8 QTY 1 No 20 QTY 3 Place the door No 8 within the Door Panel No 1 Fix the T Hinges No 20 onto the door and D...

Страница 4: ...between the floor and clad ding 6x50mm Screws 2 5 a a a a a a Please note the front and back panels are interchangeable and can be positioned on either side of the building Decide which works best be...

Страница 5: ...have got the roof panels the correct way round with the Eaves Framing to the front and back of the building From the top fix directly through the roof panels No 6 and into the ridge bar No 10 below u...

Страница 6: ...he window strips No 13 and No 14 to either side of the windows and the top Secure into place using 3x30mm screws per strip 2x20mm screws 9x30mm Screws Pre drill hole 20mm screw a b c Styrene Window Ci...

Страница 7: ...Fascias and into the plain gable 16x30mm Screws 30mm screw Pre drill hole 16 24 16 24 16 16 Fix the Door Beading strips No 12 to the door panel framing secure using 4x30mm Screws per strip Fix the doo...

Страница 8: ...2 1 3 4...

Страница 9: ...1 2...

Страница 10: ...abel and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Отзывы: