10
Automatic program
Each program is divided into 10 segments, and the running time of each segment of the program
is evenly distributed. Following is a form of time distribution of 12 programs.
Time
Programs
Set time / 10 = running time of each period
1
2
3
4
5
6
7
8
9
10
P1
SPEED
3
3
6
5
5
4
4
4
4
3
P2
SPEED
3
3
4
4
5
5
5
6
6
4
P3
SPEED
2
4
6
8
7
8
6
2
3
2
P4
SPEED
3
3
5
6
7
6
5
4
3
3
P5
SPEED
3
6
6
6
8
7
7
5
5
4
P6
SPEED
2
6
5
4
8
7
5
3
3
2
P7
SPEED
2
9
9
7
7
6
5
3
2
2
P8
SPEED
2
4
4
4
5
6
8
8
6
2
P9
SPEED
2
4
5
5
6
5
6
3
3
2
P10
SPEED
2
5
7
5
8
6
5
2
4
3
P11
SPEED
2
5
6
7
8
9
10
5
3
2
P12
SPEED
2
3
5
6
8
6
9
6
5
3