9
12. Attach a sheet metal strap loop to the flex end of the liner(s) and tie a rope to it. Two installers should pro-
ceed to the roof and drop the rope (with weight on the end to make sure it goes all the way down) and insert the
liner(s) past the flexible portion, into the existing chimney [See FIGURE 5].
NOTE: Repeat this step for second liner on chimneys 9" and larger.
FIGURE 5
13.
One installer should then return to the fireplace opening and pull the rope to guide the liner(s) into place
through the smoke shelf and the damper opening to a point 20" (508 mm) above the fireplace hearth
[See FIGURE 5]. It may be necessary for the person on the roof to turn the liner slightly to avoid mortar
chinks and misaligned tiles. The person below should wear leather gloves during this process to avoid being
cut.
CAUTION:
WHEN USING FLEX ALUMINUM LINER, USE EXTREME CAUTION WHEN STRETCHING LINER
AROUND OFFSETS SO AS NOT TO RUPTURE LINER.
Содержание SEABROOK D-30
Страница 22: ...21 LOG INSTALLATION STEP 2 LOG INSTALLATION STEP 3...
Страница 23: ...22 LOG INSTALLATION STEP 4 LOG INSTALLATION STEP 5...
Страница 24: ...23 LOG INSTALLATION STEP 6 LOG INSTALLATION STEP 7...
Страница 25: ...24 LOG INSTALLATION STEP 8 LOG INSTALLATION STEP 9...
Страница 34: ...33 Figure 21 LP PRESSURE REGULATOR NG PRESSURE REGULATOR GAS VALVE BODY SCREWS...
Страница 35: ...34...
Страница 37: ...36 TAPE SHUT JOHNSON GAS APPLIANCE COMPANY 520 E AVENUE N W CEDAR RAPIDS IA 52405 POSTAGE NEEDED...