DISASSEMBLY INSTRUCTIONS
B2-2
Lever Switch
Fig. 2-4-C
Rack Loading
A
B
The Lever should be position
between A and B.
2-5:
Remove the Traverse Holder.
Remove the 2 Insulator (F).
1.
2.
Fig. 2-5-A
Traverse Holder
TRAVERSE HOLDER/INSULATOR (F)
(Refer to Fig. 2-5-A)
Insulator (F)
(Black)
Main Chassis Ass'y
NOTE
1. After the installing of the Traverse Holder, check if the
wire is like Fig. 2-5-B.
Insulator (F)
(Black)
Fig. 2-4-D
Fig. 2-5-B
Traverse Holder
Main Chassis Ass'y
2-7: RACK FEED ASS'Y (Refer to Fig. 2-7-A)
Remove the screw
1
.
Remove the Rack Feed 1/2 Spring, Rack Feed 1/2 and
Rack Feed Lever.
1.
2.
1
Rack Feed 1
Rack Feed Lever
Rack Feed 2
Rack Feed 1 Spring
Rack Feed 2 Spring
Fig. 2-7-A
Main Chassis Ass'y
• Screw Torque: 3.5
±
0.5kgf•cm
NOTE
1.
2.
After the assembly of the Rack Feed, check if the Rack
Feed 1/2 is moving smoothly. (Refer to Fig. 2-7-B)
In case of the Rack Feed Ass'y installation, install
correctly as Fig. 2-7-C.
2-6: SWITCH PCB ASS'Y (Refer to Fig. 2-6-A)
Remove the screw
1
.
Remove the Switch PCB Ass'y.
1.
2.
Fig. 2-6-A
Switch PCB Ass'y
1
Main Chassis Ass'y
• Screw Torque: 4
±
0.5kgf•cm
NOTE
1. When installing the wire of the Switch PCB, install it
correctly as Fig. 2-6-B.
Fig. 2-6-B
Switch PCB Ass'y
Black
White
From Relay PCB
Содержание MVD2019
Страница 62: ...M5E8 03B W325025 SPEC NO O R NO...