- 31 -
Installation manual
M-WRG-II M
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L A T I O N & H E A T R E C O V E R Y
9.6
Filling gaps around the wall box with insulating material
►
Fill all gaps between the wall box and
frame construction fully with insu-
lating material (item 1 in Fig. 17) or
using another suitable filling material.
9.7
Connecting the wall box to the vapour barrier
The inner OSB board (item 1 in Fig. 25) is the vapour barrier and airtight layer. The
OSB board must be connected to the wall box (item 2 in Fig. 25) using a suitable and
approved adhesive tape, e.g. Rissan® from SIGA.
Other wall structures may require different procedures.
Fig. 25: Inner OSB board as the vapour barrier and airtight layer
C
10
0
16
0
15
15
15
12
,5
31
7,
5
A- A
C
290 M-WRG-II
M
(shortened)
1
1
1
2
2
Fig. 24: Filling gaps around the wall box with insulating
material
1