- 30 -
Installation manual
M-WRG-II M
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L A T I O N & H E A T R E C O V E R Y
9.5
Inserting the cardboard insert and plaster cover
► Insert the cardboard insert (item 1 in
Fig. 23) into the wall box (item 3 in
Fig. 23) as far as it will go.
► Insert the plaster cover (item 2 in
Fig. 23) into the wall box (item 3 in
Fig. 23) as far as it will go.
NOTICE
There is a risk that the wall box will be
deformed during the remainder of the
installation process if the plaster cover
is not inserted. If this happens, it will
not be possible to insert the ventilation
unit into the wall box.
►
Check that the red signal cover
(item 4 in Fig. 23) is seated in the plaster cover.
Fig. 23: Inserting the cardboard insert and plaster
cover
4
3
1
2