Installation manual
M-WRG-S...
- 18 -
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L AT I O N & H E AT R E C O V E R Y
10
Surface-mount installation
10.1
Marking positions of core drill holes with drilling template
►
Press the pre-punched cut-outs (item 2
in Fig. 9) for the core drill holes out of the
drilling template.
►
Position the drilling template (item 3 in
Fig. 9) at the installation location on the
internal wall.
NOTE
►
Observe the required distances of
300 mm from the ceiling and 50 mm
from the side wall.
►
Use the spirit level to align the drilling
template (item 1 in Fig. 9).
►
Fix the drilling template in place with
adhesive tape (item 4 in Fig. 9).
►
Using the spirit level, check again that the
drilling template is aligned.
►
Mark the outlines (item 1 in Fig. 10) of
the pre-punched contours in the drilling
template for the core drill holes on the
internal wall.
►
Mark the six notches (item 2 in Fig. 10) in
the drilling template on the internal wall.
►
Remove the drilling template.
►
Draw the cross-hairs (item 3 in Fig. 10) for
the core drill holes using the six marked
notches.
►
Check the marks for the core drill holes
Fig. 9: Marking positions of the core drill holes
1
3
4
2
2
Fig. 10: Marks on the internal wall
1
1
2
2
2
3
3