Rev 1.4
Mellanox Technologies
4
List of Figures
Figure 1:
Rack Rail Kit Parts
10
Figure 2:
Placement of Switch in Rack
11
Figure 3:
Mounting Options
12
Figure 4:
Screwing on the Rail
12
Figure 5:
Inserting the Caged Nuts
13
Figure 6:
Slide the Rail into the Rail Slide
13
Figure 7:
Status LEDs 5 Minutes After Power On
14
Figure 8:
Two Power Inlets - Electric Caution Notifications
16
Figure 9:
Console Port
17
Figure 10: Reset Button
24
Figure 11: Transfer Power Cord
25
Figure 12: Install the Switch Slide
26
Figure 13: Transfer Power Cord Finished
26