SwitchX 40GigE 1U Ethernet Switch Installation Guide
Rev 1.0
Mellanox Technologies
3
1
Mechanical Installation
Installation and initialization of the switch platform are straightforward processes, requiring
attention to the normal mechanical, power, and thermal precautions for rack-mounted equipment.
1.1
Installation Safety Warnings
For Safety Warnings in French, German, and Spanish see the User Manual (you can download it
from the mellanox.com website MSX1024 product page).
1. Installation Instructions
2. Over-temperature
3. Stacking the Chassis
4. Redundant Power Supply Connection - Electrical Hazard
5. During Lightning - Electrical Hazard
6. Copper Cable Connecting/Disconnecting
Read all installation instructions before connecting the equipment to the power source.
This equipment should not be operated in an area with an ambient temperature exceed-
ing the maximum recommended: 45°C (113°F). Moreover, to guarantee proper air
flow, allow at least 8cm (3 inches) of clearance around the ventilation openings.
The chassis should not be stacked on any other equipment. If the chassis falls, it can
cause bodily injury and equipment damage.
This product includes a blank cover over the space for the redundant power supply. Do
not operate the product if the blank cover is not securely fastened or if it is removed.
During periods of lightning activity, do not work on the equipment or connect or dis-
connect cables.
Copper cables are heavy and not flexible, as such they should be carefully attached to
or detached from the connectors. Refer to the cable manufacturer for special warnings
and instructions.