Hardware Installation
Rev 2.6
21
Mellanox Technologies
3. After inserting a cable into a port, Green LED indicator will light when a connection is estab-
lished (that is, when the unit is powered on and a cable is plugged into the port with the other
end of the connector plugged into a functioning port). See
4. After plugging in a cable, lock the connector using the latching mechanism particular to the
cable vendor.When data is being transferred the Green LED will blink. See
“Adapter Card LED Operations,” on page 68
5. Care should be taken as not to impede the air exhaust flow through the ventilation holes. Use
cable lengths which allow for routing horizontally around to the side of the chassis before
bending upward or downward in the rack.
6. To remove a cable, disengage the locks and slowly pull the connector away from the port
receptacle. LED indicator will turn off when the cable is unseated.
3.8
Adapter Card Un-installation Instructions
3.8.1 Safety Precautions
1. Remove any metallic objects from your hands and wrists.
2. It is strongly recommended to use an ESD strap or other antistatic devices.
3. Turn off the system and disconnect the power cord from the server.
3.8.2 Card Un-installation
1. Verify that the system is powered off and unplugged.
2. Wait 30 seconds.
3. To remove the card, disengage the retention mechanisms on the bracket (clips or screws).
The adapter is installed in a system that operates with voltages that can be lethal.
Before un-installing the adapter card, please observe the following precautions to
avoid injury and prevent damage to system components.
Please note that the following images are for illustration purposes only.