Melink Corporation (513) 965-7300 www.melinkcorp.com
Remove the Optic Cables from the box. Insert the end of one cable with the small anti-
snag boot up through the purge pipe from the optic housing with the Emitter Board. Plug in the
cable end with the large anti-snag boot into the jack on the Emitter Board and push any excess
slack up the purge pipe. Mount the cover onto the base. Repeat with Receiver Board.
Emitter
16
Install Optic Sensors
Receiver
L
Install Optic Cables
Run the cables up each Purge
Pipe and verify that they are
located inside the notches
before installing the APUs.
Run Cable Up Purge Pipes
5
K
MELINK
Intelli-Hood
Controls
®
®