SECTION 6 - INITIAL BREAK-IN MAINTENANCE
GENERAL MAINTENANCE
Perform the following maintenance checks after the initial break in period.
1. Check Bolts and Nuts for looseness. Tighten it if necessary.
2. Check for fuel and oil leak.
3. Keep the RUBBER BUFFER away from oil and fuel.
4. Check the V-Belt for wear, damage and cracks. If necessary, replace the belt with new one.
5. Please refer to “Owners Manual” for
Robin EH09-2D
engine for KP-30 and KP-50 regarding engine maintenance.
6-2
Содержание KP30A
Страница 1: ...OPERATION MAINTENANCE AND PARTS MANUAL For KP30A KP50 VIBRATORY PLATE COMPACTORS October 10 2015...
Страница 5: ......
Страница 7: ......
Страница 32: ...SECTION 15 MISCELLANEOUS AND OPTIONAL EQUIPMENT NOTE No Miscellaneous or Optional Equipment 15 1 15 2...
Страница 33: ...SECTION 16 SCHEMATICS NOTE No Schematics are necessary for this unit 16 1 16 2...
Страница 34: ......
Страница 35: ......