23
Do not dispose of with domestic waste!
Important! Observe operating
instructions!
„Tested Safety“ voluntary quality mark
Housing is double insulated
CE Mark (conformity to European
safety standards)
BJ
Year of construction
SN:
Serial number
SN: XXXXX The first two underlined numbers
give the month of manufacture.
Operation
Mount the device support. Plug the device into the
mains. Guide the glue stick into the filling hole until
contact is made so that approx. After heating (min.
3–5 min), carefully actuate the lever until glue exits
the nozzle, at the same time inserting the second
glue stick. Refill gluing pins when necessary. Join the
parts together within 15–20 seconds. During breaks
always place the device on its support. Precise
operation with longer precision nozzle.
5414510-Heissklebegeraet_man.indd 23
5414510-Heissklebegeraet_man.indd 23
06.03.20 11:51
06.03.20 11:51