Fig. 48: Float
8.
Guide the float (Fig. 48/1) into
the sight glass so that the lid of
the float (recognizable by the
two drill holes) points towards
the slot nozzle
9.
Lubricate the process connec-
tion O-rings lightly
A list of suitable lubri-
cants is contained in the
annex
Fig. 49: Process connection (Inlet)
10.
CAUTION!
Carefully insert the
process connection
(Inlet) (Fig. 49/1) into the
sight glass, pressing
lightly.
The sight glass can
break if too much force is
exerted or if the process
connection is canted
Maintenance
Maintenance > Assembly
03.09.2018
DWG Module BASICS Flow Monitor
66