![Meinertz FloorLine Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/meinertz/floorline/floorline_installation-instructions-manual_1766309004.webp)
Read these installation instructions
carefully before installing the Convec
FloorLine panel.
The installation of FloorLine panels is
divided into pre-installation and final
installation.
Pre-installation comprises installation of
fittings and any shut-off valves connected
to the heating system as well as electric
wiring.
Final installation comprises the panel
itself, which should be installed as late
in the building process as possible to
provide the best protection of mechanical
parts against dust and paint residue, as
well as shocks, impacts and other damage.
Installation duct
The panels are supplied with self-jointing
rubber strips, which “absorb” small
inaccuracies in the installation duct.
To achieve the visually best result, it is
necessary to observe the measurements
of the installation duct as precisely as
possible, particularly the duct width of
139 mm (see page 6).
Adjustments
The FloorLine panels are equipped with
integrated adjustment screws, which
enable accurate adjustment of the panel
height to align with the floor level.
Please ensure that all adjustment screws
are resting on the base to achieve maxi-
mum stability.
4
Maj 2007
NB!
All electrical and plumbing work must be
carried out by authorised electricians and
plumbers.
Introduction
Before installation
Before installation of the panel the fol-
lowing should be completed:
System pipes, flow and return
External wiring for CHR/BMS and
power supply
Check! Measurements of the instal-
lation duct and level of final floor
Check! Panel number
•
•
•
•
Содержание FloorLine
Страница 1: ...FloorLine Installation Instructions GB ...