FloorLine
Installation
Instructions
GB
Страница 1: ...FloorLine Installation Instructions GB ...
Страница 2: ...uminium 4a Finned pipe flow copper 4b Finned pipe return copper 5 Velcro tape 6 Flexible pipes 7 Motor 8 Fan aluminium 9 Bearing block aluminium brass 10 Fan coupling plastic 11 Pipe fixture aluminium 12 Installation profile aluminium 13 Panel end aluminium 14 CHM motor control print 15 Motor connection 16 Connection cable and terminals 17 Adjustment blocks aluminium ...
Страница 3: ... fittings page 6 Installing the panel page 6 Checking the joints page 8 Power connection page 8 Adjusting the panel page 9 Opening the guide profile page 9 Connecting several panels in series page 11 Diagram Control with TWW room thermostat page 13 Diagram Control via external CTS signal page 14 Operating conditions page 15 Contents ...
Страница 4: ...small inaccuracies in the installation duct To achieve the visually best result it is necessary to observe the measurements of the installation duct as precisely as possible particularly the duct width of 139 mm see page 6 Adjustments The FloorLine panels are equipped with integrated adjustment screws which enable accurate adjustment of the panel height to align with the floor level Please ensure ...
Страница 5: ... Lift the gratings off the panel and place them on the opened part of the box NB Avoid mixing gratings from different panels as they are cut to individual dimensions Remove the panel from the box Unpacking the panel 3 3 Under the panel is a protective sheet of strong cardboard Use this to protect the panel against dust impacts etc ...
Страница 6: ...as follows Panels shorter than 6000 mm the length equals total panel length 5 mm Panels longer than 6000 mm the duct is extended further 1 mm per meter panel Positioning of installation fittings 2 2 65 mm Fix the enclosed installation fitting to the base of the installation duct Connect the system pipes NB Check that the flow and return pipes are correctly positioned Installing the panel 1 4 1 Flo...
Страница 7: ...installation duct Installing the panel 3 4 Attach the flexible pipes to the installation fittings NB The enclosed gaskets must be used Installing the panel 4 4 Tighten the joints with a moderate torque You are recommended to use an NV24 open ring spanner order no 088H4821 ...
Страница 8: ...ise the system and check for possible leaks Power connection 1 2 Connect cables from the CHR room thermostat or BMS system and from the 24 V power supply Power connection 2 2 Wiring must be carried out according to the electrical curcuit diagrams on page 13 14 ...
Страница 9: ...long the full length of the panel Use a 2 5 mm Allen key NB On account of the panel s load strength it is important for all adjusting screws to be adjusted correctly Adjusting the panel 2 2 Put the floor grating in place and check that it is aligned with the floor surface Opening the guide profile 1 4 Remove the floor grating from the panel ...
Страница 10: ...ure by pulling sightly Repeat this along the full length of the panel Opening the guide profile 3 4 The guide profile can now be lifted to give access to the base of the panel Opening the guide profile 4 4 When the guide profile is closed secure it with light pressure on the Velcro pads ...
Страница 11: ...ise panel jointing Extend the flexible pipes to reach the fittings on the next panel Connecting several panels in series 2 5 To give room for thermal expansion pull the panels 2 mm apart Connecting several panels in series 3 5 1 1 2 2 Insert gaskets between the flexible pipes and the fittings before fastening ...
Страница 12: ...ls in series 4 5 Tighten the flexible pipes with an NV24 ring spanner NB Always hold the pipe in place in the panel with multigrip pliers Connecting several panels in series 5 5 After tightening pressurise the system and check for leaks ...
Страница 13: ... HV CV CV Maj 2007 13 System with CHR room thermostat A CHR can control up to 10 Convec pan els in the same room A Convec panel can be supplied with a valve to control flow through the panel Wiring Supplied from factory TDM power supply CHR room thermostat CHM motor control CHR room thermostat TDM power supply TDM power supply CHR room thermostat NB CHR room thermostats and CHM motor control have ...
Страница 14: ...motor control will continue to Wiring Supplied from factory TDM power supply BMS system CHM motor control BMS system TDM power supply TDM power supply perform the panel control e g stopping the motor if blocked or the control of any decentralized valves NB Water supply valves are connected to cooling outputs 9 and 10 24 Vdc 0 Vdc 24 Vdc 0 Vdc Heat Cool RPM 0 10 V C valve C valve BMS system 24 Vdc ...
Страница 15: ...Maj 2007 15 Operating conditions Operating pressure 10 bar Test pressure 13 bar Storage temperature 10 60 C Water temperature 8 85 C Water quality VDI 2035 ...
Страница 16: ...16 Maj 2007 For further information please contact MEINERTZ A S Sverigesvej 11 DK 8660 Skanderborg Phone 45 8652 1811 Fax 45 8652 1515 www meinertz com ...