Meinberg IMS-VSI Скачать руководство пользователя страница 5

2 Safety Instructions for hot pluggable Modules

Check before every maintenance work on the system:

If a data backup is required?

Is a backup required, verify the data recovery which is done by this backup.

Make sure to avoid any static discharge while working - use a grounding cable and/or antistatic gloves
during installation and removal of hot pluggable components.

If you are replacing a hot pluggable power supply, unplug the power cable prior to removing the module
from the case.

Never open a power supply. In power supplies dangerous voltages can still remain even after disconnection
from the power supply. Always send power supplies back to the manufacturer for maintenance.

Exchange of hot-swap components

Ensure that components which will be replaced during operation, always be treated with the utmost care.
Avoid contact with live components.

Electrostatic discharge can damage electronic components. For this reason, ensure protection against
electrostatic discharges by wearing anti-static shoes while working with the system.

Take care when removing and installing the hot-plug modules. Always work with the utmost caution.
Touch the modules only at the edges.

Place the module out of the box or after removal from the system with the component side to the top on
a grounded and static-free surface.

Storage of an IMS module must be done in a dry place.

Installation or removal from hot-swap components only by authorized personnel!

2

Date: 1st July 2020

IMS-VSI Setup Guide

Содержание IMS-VSI

Страница 1: ...MANUAL IMS VSI Setup Guide Hot Plug Module 1st July 2020 Meinberg Funkuhren GmbH Co KG...

Страница 2: ......

Страница 3: ...al Safety Hints 3 2 2 Supply Voltage 3 2 3 Cabling 4 3 Replacement or Installation of a Hot pluggable IMS Module 5 3 1 Important Hints for hot pluggable IMS Modules 6 4 VSI Video Synchronization Input...

Страница 4: ...Funkuhren GmbH Co KG Lange Wand 9 31812 Bad Pyrmont Germany Phone 49 0 52 81 93 09 0 Fax 49 0 52 81 93 09 230 Internet https www meinbergglobal com Mail info meinberg de Date 01 07 2020 IMS VSI Setup...

Страница 5: ...ack to the manufacturer for maintenance Exchange of hot swap components Ensure that components which will be replaced during operation always be treated with the utmost care Avoid contact with live co...

Страница 6: ...tion of high voltage devices 2 2 Supply Voltage WARNING This device is powered by a dangerous voltage Nonobservance of the safety instructions of this manual may lead to serious damage to persons and...

Страница 7: ...ther work done the connectors particularly when connectors are opened may never be carried out when the installation is energized All connectors must be covered to prevent from accidental contact to l...

Страница 8: ...dy built in module Pull the module carefully out of the holding rail Note that the module is firmly anchored in the connector block of the housing You need a certain amount of force to release the mod...

Страница 9: ...econd power supply must be installed before removing replacing it to keep your system functioning I O ESI and MRI Slots hot swappable CLK1 CLK2 hot swappable Afer the exchange or the installation of a...

Страница 10: ...Status Indicators LED St VSI status LED In Status of the backplane s reference signals LED A Status of the input signals 1 2 at the board LED B Status of the input signals 1 2 at the board Operation c...

Страница 11: ...References Men IO Config Input Configuration VSI Karte Video Sync Interface configurable Inputs Input 1 Video Sync In Format PAL 625i Epoch TAI Signal Source Single ended signal input Time Code Modes...

Страница 12: ...rd Input 2 LTC In Type LTC 25 FPS Frames per Second Daily Jam Time Time of Day hh ii Input 3 Word Clk In Port Type GPIO General Purpose Input Output Direction Input Operation Mode Always enabled IMS V...

Страница 13: ...Input 4 PPS In Pulse length 5 s active high 10 Date 1st July 2020 IMS VSI Setup Guide...

Страница 14: ......

Отзывы: