![Meinberg FUNKUHREN ANZ14_V3 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/meinberg/funkuhren-anz14_v3/funkuhren-anz14_v3_operating-instructions-manual_1766122008.webp)
8
Installation
Supply Voltage
The supply voltage is applied to the radio clock via a connector in the rear panel. The
clock has no power switch and starts operation immediately after connecting the
supply voltage. Depending on the supply voltage (see designation on the rear) the
clock is equipped either with a 230V AC power socket or with a 2-pin DFK connector
for 5V, 12V or 24V DC input.
Mounting the Antenna
Generally it is important to position the antenna in an optimal way. The antenna
should be aligned at a right angle to the direction of the transmitter (Frankfurt). It
should be mounted at least 30 centimeters away from the clock unit and from solid
steel. A distance of several meters is recommended to all TVs or computer monitors.
In order to get the maximum signal, the antenna should be aligned in two steps. First it
should be turned
slowly
until the modulation-LED is mostly dimmed. Finally the
antenna must be turned by 90° from this position to obtain maximum signal.
Содержание FUNKUHREN ANZ14_V3
Страница 1: ...FUNKUHREN Technical Information Operating Instructions ANZ14_V3...
Страница 4: ......
Страница 17: ...17 Component Layout Main Board...
Страница 18: ...18...
Страница 19: ...19 Component Layout Display Board...
Страница 20: ......