Operating instructions FV 28 GiO
Datei:1D3A4F9D.doc
9671086
30/38
W e reserv e the right to change ex ecution and construction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
Par.
No.
Configuration
options
Use as
value
range
Unit
Factory
setting
Note
241
Air gap (FA) in-
corporated?
Parameters
0/1
-
1
0: FA not available, final rinse over
Y1
Measure conductance VE (option-
al)
242
Drain pump (LP)
incorporated?
Parameters
0/1
-
0
0: LP not incorporated
1: LP incorporated
321
Rinse agent pump
output
Parameters
0.1 ...10
l/h
1.3
Rinse agent pump.
Output definition.
322
Detergent pump
output
Parameters
0.1 ...20
l/h
8.5
Detergent pump
Output definition.
326
Pipe vent time
Rinse agent
Parameters
0 ...255
sec.
180
Activate rinse agent pump tempo-
rarily to remove air from pipe.
327
Pipe vent time
Detergent
Parameters
0 ...100
sec.
30
Activate detergent pump tempo-
rarily to remove air from pipe.
346
Indication
LED 2 or LED 1
Parameters
0/1
-
1
0: LED2 with LEDs
1: LED1 with temperature display
16.5 Assignment list
View inputs / control outputs
Indication
Input / output / other
Left
Right
dIn
1
0/1
Door closed
dIn
2
0/1
Boiler level
dIn
3
0/1
Tank level
dIn
7
0/1
Hall-sensor ADT (option)
dIn
9
0/1
Level rinse aid (option)
dIn
10
0/1
Level detergents (optin)
AIn
1
83°C
Boiler temperature
AIn
2
60°C
Tank temperature
out 1.1
0/1
Voltage (reverse osmosis)
out 1.2
0/1
Booster Pump
out 1.3
0/1
Operation indicator
out 2.1
0/1
Wash pump
out 2.2
0/1
Tank heating
out 2.3
0/1
Drain pump
out 3.1
0/1
Filling valve
out 3.2
0/1
Soft starter valve
out 3.3
0/1
Dosing of rinse aid
out 3.4
0/1
Detergent dosage
Out 3.6
0/1
Boiler heating
Leak water switch condition:
Leak water switch must not have operated.