background image

                            MEI CASHFLOW SC83  Page-18

www.meigroup.com                                                        Part # 252055088 G3

UPDATING SOFTWARE

Replacing the programmed PROM

 (Continued).

8. Once in position, move the yellow cover forward (as if you were opening the acceptor module)
until the cover locks into place.

9. Close the acceptor module and re-install it into the chassis.

10. If  the power is on, the unit will power up and perform a run and stack.

Содержание Cashf low SC83

Страница 1: ...MEI CASHFLOW SC83 Page 1 www meigroup com Part 252055088 G3 MEI Cashflow SC83 Installation Operation Manual MEI Inc 2007...

Страница 2: ...MEI CASHFLOW SC83 Page 2 www meigroup com Part 252055088 G3...

Страница 3: ...rley Redding RG6 1AZ United Kingdom Internet http www meigroup com MEI Inc 2007 Except as permitted under the relevant local legislation no part of this publication may be copied transmitted transcrib...

Страница 4: ...alling Locks on the Cashbox 13 UPDATINGSOFTWARE Cashflow Programing Module CPM 14 15 Replacing the PROM 16 18 HARNESSINGAND CONNECTORS EBDS Interface Pin Out 19 RS232 Interface Pin Out 19 MAINTENANCE...

Страница 5: ...tured Last digit of year Week Manufactured 0 52 Sequential Production Number Model Number 00 OEM Configurable No Harness 02 OEM Proprietary 04 Opto Isolated EBDS 07 RS232 EBDS Flash Unit blank P PROM...

Страница 6: ...MEI CASHFLOW SC83 Page 6 www meigroup com Part 252055088 G3 OVERVIEW COMPONENTS Acceptor Module Chassis Cashbox...

Страница 7: ...OR SHORT NOTE PATH DURABLE WELDED PLASTIC EXTERIOR RECESSED PLASTIC GEARS DUAL LOCK CAPABILITY COMMON ACCEPTOR MODULES PC STYLE EDGE CONNECTOR INTERFACE CARDS ACCEPTOR RELEASE LATCH NOTE PATH RELEASE...

Страница 8: ...odels Entry guides for the SC83 Not all entry guides fit in every machine Your choice regarding entry guides will depend on machine specifications Below are three entry guides that MEI currently manuf...

Страница 9: ...interference with any equipment operation Note If you have a custom configuration you may need to contact our technical support group for assistance Once the connections are made you will need to lin...

Страница 10: ...t the Acceptor Module so that the release lever locks into place The acceptor should be firmly seated to ensure proper engagement of the locking feature To remove the unit pull upwards on the release...

Страница 11: ...entry guide to the eight pin connector located on the left hand side of the face of the acceptor module Make sure that the entry guide is aligned so the machine door closes properly Acceptor Module e...

Страница 12: ...ert the cashbox all the way in so that the rear of the cashbox is flush against the chassis wall Removing the Cashbox When the note acceptor is installed in a machine you just need to grab the yellow...

Страница 13: ...ying policies etc The customer is responsible for selecting a lock with performance that is fit for the intended purpose MEI does not test or endorse any specific brand of lock for security characteri...

Страница 14: ...he Cashflow Programming Module See fig 1 below 2 Plug the type A end of your USB harness to the USB type A port of the CPM Plug the type B end of the same USB harness into the USB type B port of the C...

Страница 15: ...on the CPM will turn off 4 Disconnect the USB harness from the Cashflow SC83 once the LEDs on the CPM are off 5 Once dowload is complete the Cashflow SC83 s diagnostic LEDs will flash five times green...

Страница 16: ...module from the chassis Instructions on how to remove it are on page 10 2 Open the acceptor module by placing the palm of your hand on the front of the module and placing your fingers around the top o...

Страница 17: ...cing the programmed PROM Continued 5 You may now remove the PROM using a PLC puller 6 Insert the new PROM Replacing the yellow cover Note To install the yellow cover the acceptor module must remain op...

Страница 18: ...he programmed PROM Continued 8 Once in position move the yellow cover forward as if you were opening the acceptor module until the cover locks into place 9 Close the acceptor module and re install it...

Страница 19: ...d2 2 6 Pink RS232 EBDS RXD1 L 7 Blue Power 2 B 8 Purple LED Supply 9 9 Not Populated 10 Not Populated 11 Green Power 1 A 12 Tan RS232 EBDS TXD1 K NOTES 1 RXD refers to input to the note acceptor TXD i...

Страница 20: ...how to remove it are on page 10 Open the acceptor module by placing the palm of your hand on the front of the module and placing your fingers around the top of the yellow cover as shown in the diagram...

Страница 21: ...or fault Replace the acceptor with a programmed spare 2 Flash Red Interface board hardware fault Replace the interface board 3 Flash Red Invalid Config Coupon Cash Box Memory Fault 4 Flash Red Solid R...

Страница 22: ...led on the note acceptor Some entry guides do not plug into the note acceptor they plug directly to the host machine 4 How is software updated in CASHFLOWTM SC83 Flash units and PROM units in the fiel...

Страница 23: ...ces Green 3 flashes Not used Green 4 flashes Not used Yellow Solid Cash Box unseated Cash Box not present To be able to reset the not present Cash Box Yellow 1 flash Poor Acceptance Need for cleaning...

Страница 24: ...machines It uses the IGT ID024 interface SC8304 is a Flash unit made to interface to various machines It uses MEI Opto Isolated EBDS Interface SC8304 P is a PROM unit made to interface to various mach...

Страница 25: ...e rate drops below normal 14 Can I use alcohol to clean a CASHFLOWTM SC83 unit Alcohol is not the preferred cleaning solution Refer to Question 13 15 Can I use cleaning cards Not necessary Cleaning ca...

Страница 26: ...Like model number acceptors may be easily swapped i e SC8302 to another SC8302 Consider the machine denomination and verify that the correct notes are enabled disabled and that any entry guide place...

Страница 27: ...MEI CASHFLOW SC83 Page 27 www meigroup com Part 252055088 G3 DRAWINGS...

Отзывы: