6-1
MPT12 Manual
24 May 2017
SECTION 6
Scheduled Maintenance Inspections
Contents
DESCRIPTION
This section establishes scheduled maintenance inspections of the MPT at the designated frequencies.
Performing these inspections will identify potential system discrepancies and allow preventative maintenance
to be performed before a component or system is rendered totally inoperative.
**NOTE:
The recommended oil change intervals are based upon operating conditions, speeds, and loads.
Limited service applications may allow the recommended interval to be increased. Sever service applications
may require the recommended interval to be reduced. For more information, contact Mega Product Support at
U.S. Toll Free 1-800-345-8889 or Direct 1-505-345-2661 or visit our website at www.megacorpinc.com for more
contact information.
FREQUENCY
AXLE AND BRAKE SYSTEM
1000
MILES
30,000
MILES
100,000
MILES
EVERY
6
MONTHS
ANNUALLY
Check
oil
level.
Change
oil
if
the
oil
level
is
less
than
0.25”.
Additionally,
change
the
oil
and
grease
the
bearings
whenever
the
wheel
end
is
disturbed
during
wheel
or
hub
removal
or
if
the
oil
is
contaminated.
X
(Heavy
‐
Duty
Service)
If
the
MPT
accumulates
over
60,000
miles
a
year,
change
the
oil
and
grease
the
bearings
every
30,000
miles.
X
(Heavy
‐
Duty
Service)
If
the
MPT
accumulates
less
than
60,000
miles
a
year,
change
the
oil
and
grease
the
bearings
every
six
months.
X
(Standard
‐
Duty
Service)
If
the
MPT
accumulates
over
100,000
miles
a
year,
change
the
oil
and
grease
the
bearings
every
100,000
miles.
X
(Standard
‐
Duty
Service)
If
the
MPT
accumulates
less
than
100,000
miles
a
year,
change
the
oil
and
grease
the
bearings
once
a
year.
X
Check
brake
pods
for
security,
damage,
and
leaks
X
FREQUENCY
STEP
MPT STRUCTURE
150
HRS
(WEEKLY)
250
HRS
(BI
‐
WEEKLY)
500
HRS
(MONTHLY)
1,000
HRS
(QUARTERLY)
5,000
HRS
(ANNUALLY)
1
Check
filler
port
trash
screen
for
debris
and
inspect
assembly
for
security
and
damage.
Repair
or
replace
trash
screen
as
required.
X
2
Visually
inspection
tank
exterior
for
damage
and
evidence
of
leaks.
Repair
as
required
X
3
Check
all
lights
for
proper
operation.
Replace
lights
as
required.
X
4
Check
all
interior
tank
structure
for
leaks,
cracks
and
condition
of
epoxy
coating
(if
equipped).
Repair
structure
and
coatings
as
required.
X
MPT Structure ...................................................................6-1
Control System .................................................................6-2
Содержание MPT12
Страница 3: ...MPT12 Manual 24 May 2017 TABLE OF CONTENTS B Blank ...
Страница 13: ...MPT12 Manual 24 May 2017 SECTION 2 System Description 2 6 Blank ...
Страница 15: ...MPT12 Manual 24 May 2017 SECTION 3 Commissioning 3 2 Blank ...
Страница 20: ...MPT12 Manual 24 May 2017 SECTION 4 Operation Instructions 4 5 Figure 4 1 Tie downs ...
Страница 21: ...MPT12 Manual 24 May 2017 SECTION 4 Operation Instructions 4 6 Blank ...
Страница 37: ...MPT12 Manual 24 May 2017 SECTION 8 Illustrated Parts Breakdown 8 6 Blank ...
Страница 39: ...MPT12 Manual 24 May 2017 SECTION 9 Appendix Installation Drawings 9 B Blank ...
Страница 44: ...Appendix A MPT12 A 5 ...
Страница 46: ...Appendix A MPT12 A 7 ...
Страница 47: ... IF EQUIPPED Appendix A MPT12 A 8 ...
Страница 48: ...Appendix A MPT12 A 9 ...
Страница 49: ...Appendix A MPT12 A 10 ...
Страница 66: ...Appendix A MPT12 A 27 ...