SECTION 3
Commissioning
Contents
DESCRIPTION
The following section details the test procedure steps
required for inspection of the stand tank prior to
placing the stand tank into service. If you are having
difficulties with these procedures, please contact The
MEGA Corp. Product Support Group at: U.S. Toll Free
1-800-345-8889 or Direct 1-505-345-2661 or visit our
website at www.megacorpinc.com for more contact
information.
1. Check hydraulic oil level.
2. Check oil level in wheel hubs.
3. Check engine oil & fuel.
4. Start engine.
5. Remove locking pins.
6. Raise tank until pin hoist clears top pinhole.
7. Lower tank& replace locking pins.
8. Butterfly in closed position.
9. Fill with water.
10. Pull up on float, adjust valve until water flow
shuts off
11. Fill tank to check operation of float.
12. Drain water back into main supply.
13. Tie down float, toolbox, and hydraulic tank cap.
Description .........................................................................3-1
Содержание MPT12
Страница 3: ...MPT12 Manual 24 May 2017 TABLE OF CONTENTS B Blank ...
Страница 13: ...MPT12 Manual 24 May 2017 SECTION 2 System Description 2 6 Blank ...
Страница 15: ...MPT12 Manual 24 May 2017 SECTION 3 Commissioning 3 2 Blank ...
Страница 20: ...MPT12 Manual 24 May 2017 SECTION 4 Operation Instructions 4 5 Figure 4 1 Tie downs ...
Страница 21: ...MPT12 Manual 24 May 2017 SECTION 4 Operation Instructions 4 6 Blank ...
Страница 37: ...MPT12 Manual 24 May 2017 SECTION 8 Illustrated Parts Breakdown 8 6 Blank ...
Страница 39: ...MPT12 Manual 24 May 2017 SECTION 9 Appendix Installation Drawings 9 B Blank ...
Страница 44: ...Appendix A MPT12 A 5 ...
Страница 46: ...Appendix A MPT12 A 7 ...
Страница 47: ... IF EQUIPPED Appendix A MPT12 A 8 ...
Страница 48: ...Appendix A MPT12 A 9 ...
Страница 49: ...Appendix A MPT12 A 10 ...
Страница 66: ...Appendix A MPT12 A 27 ...