Měřící Energetické Aparáty
6
Item Name
Description
4
RJ45
connector
ETHERNET 100BaseTx interface connector for connecting in
local network.
• The green
LINK_LED
signalizes data line speed
(lit 100 Mbit/s / not lit 10 Mbit/s)
• The orange
ACTIVITY_LED
light signalizes a data trans-
mission in progress
5
Status
of LED
indicator
RUN
Short flashing – the monitor is performing measurements accor-
ding to the programmed parameterization.
Repeated short flashing – the monitor has been programmed but
is not measuring yet, because the preset time of measurement
start has not come yet or the supply has not switched on due to
programmed measurement with delayed start.
Alternating light 1:1 – oscillographic recording.
6
Status of
measured
voltages
U1, U2,
U3, U4
Signalization of the status of voltage at the inputs U1, U2, U3
and U4 during measurement at the LV level (Y-connection) or
U1-U2, U2-U3, U3-U1 during measurement at the MV and HV
level (delta connection).
Light:
• constant – voltage is within the preset tolerance range
(0.9 U
n
to 1.1 U
n
)
• one flash – voltage is within the preset range of interruption
• two flashes – voltage is within the preset range of dip
• three flashes – voltage is the preset range of swell.
7
GPS
antenna
connector
Connector for connecting a coaxial cable of antenna for receiving
GPS time synchronization signal.
8
DIN rail
lock
Orange locks situated at the top and bottom of the device must
be unlocked for dismantling the device from the DIN rail.
9
Power
supply
terminals
Terminals for connecting power supply voltage
Содержание Meg39
Страница 1: ...PQ monitor MEg39 User manual M c Energetick Apar ty a s 664 31 esk 390 Czech Republic...
Страница 2: ......
Страница 31: ......