7
If you are adding more than one appliance repeat the stages 2-4 before screwing the
thumb screw back on top of the stud securing the Eyelets in place and making the
electrical connection.
Before Re-attaching the lid using the two screws removed in stage 1 make sure all of
the nuts are fully tightened before the lid is attached.
24V 4 pole extension cables are available from Meech in 1, 3 and 8 meter lengths.
Ensure the 24V supply is off before connecting the power cable. Once the cable is
connected turn the supply back on, the LED’s located on either side of the Hyperion
power supply should be green. If they are not please refer to the fault finding and
diagnostic check located on the next page.
Содержание Hyperion 906
Страница 1: ...Operating Manual Hyperion 906 High Voltage Power Supply v1 13A...
Страница 2: ......
Страница 4: ......
Страница 19: ......