Installation

Correct positioning of the bar is vital for efficient operation. The bar should be 
positioned directly opposite an earthed point/plate or a bar of opposite polarity. Non-

conductive materials passing between the Generator bar and earth, or bar of opposite 
polarity, will be pinned together. The bar should typically be positioned 30 to 50mm 
away from the nearest earthed object but this is subject to set up conditions. If the 
generator ‘trips’ the bar has been positioned too close to and ground reference. 

The bar should be positioned away from any other ground reference point. These 

may disrupt the ion stream and reduce the effectiveness of the bar and the degree of 

pinning achieved on the process material.

Distorted ion field

Process material direction

Содержание 993R

Страница 1: ...993R Spark Free Operating Manual Generator Bar...

Страница 2: ......

Страница 3: ...marks For further information please refer to our Head Office or visit www meech com Meech Static Eliminators Ltd 27 10 17 Contents Introduction 3 Unpacking and Inspection 4 Operation 5 Installation 6...

Страница 4: ......

Страница 5: ...R is a high performance Generator Bar for use with the Meech range of 50kV and 30kV high voltage DC power supplies The 993R features resistively coupled emitter pins rendering it near shockless and pr...

Страница 6: ...it from accidental damage Nevertheless we recommend careful examination of the carton and contents for any damage If damage is evident do not destroy the carton or packing material and immediately no...

Страница 7: ...ely coupled electrodes of the generator bar are energised by the high voltage DC generated by the power supply The electrodes emit this energy in the form of a Corona Discharge This electrical dischar...

Страница 8: ...e pinned together The bar should typically be positioned 30 to 50mm away from the nearest earthed object but this is subject to set up conditions If the generator trips the bar has been positioned too...

Страница 9: ...made If the unit continues to trip contact Meech International Head Office or your local distributor As this equipment may give an electrical shock if the pins are touched the following procedure must...

Страница 10: ...Either VE or VE Max Temperature 60 C Weight 400g per m approx Cable 2 metres in flexible conduit as standard longer lengths can be specified when ordering Construction PVC extrusion titanium emitter...

Страница 11: ...may only be required on a monthly basis Advanced systems with performance monitoring e g 977CM and 904CM will alert the operator to the need to clean the equipment before performance drops to an unacc...

Страница 12: ...label Be sure it is well packed in a sturdy carton with shock absorbing material Include a note stating the nature of the problem as specifically as possible and also include instructions for returni...

Страница 13: ...11...

Страница 14: ......

Страница 15: ......

Страница 16: ...232 4210 Fax 1 330 564 2005 email info meech com Meech Shavotech 29 2 Kharadi Off Pune Nagar Road On Old Kharadi Mundhwa Road Pune 411014 Maharashtra India Tel 91 0 703 093 8211 91 0 741 000 4817 Fax...

Отзывы: