Installation Checks
Before starting the GS Series mixer a few checklist
items are recommended to confirm the installation is
correct.
Installation Checks
Check
Is the mixer placed correctly with slots facing up? (Placement)
Is the mixer retrieval chain connected securely? (Placement)
Is the kellum grip supporting the weight of the cord/hose? (Placement)
Is the cord/hose ran through the cord seal in the top of tank junction box? (Placement)
Is the Tank Penetration fitting sealed with Lexel? (Top of Tank Junction Box)
Are the top of tank junction box splices correct and each splice individually sealed to protect from
corrosion? (Top of tank Junction Box)
(Not applicable for GS-12-Air)
Is the field wiring correct? (Requirements)
Is The Mixer submerged in at least 2’ (0.75m) of water?
Pre Operation Checks
Reading
Continuity Check
Line to Neutral:
Line to Ground:
Neutral to Ground:
Source Voltage Reading
Operation Check (While Mixer is Running)
Reading / Observation
Source Voltage Reading
Amperage Reading
Flow Check Auditory
Flow Check Visual
Operation Checks
The following checklist items are recommended to
confirm proper operation.
© 2019 Medora Corporation | www.medoraco.com | 866 - 437 - 8076 | [email protected]
Final Checklist
Final Checklist
1931_10003_20191001
O&M_GS_12_Air_120V_10389_20191017 - 10